File #: 060318    Version: 0 Name: South Booster Station Design Engineering
Type: Resolution Status: Passed
File created: 6/6/2006 In control: Village Board
On agenda: Final action: 6/15/2006
Title: N. South Booster Station Design Engineering (Resolution) Resolution authorizing an Agreement with Christopher B. Burke Engineering, Ltd. in the amount of $169,105.60 for design engineering services related to the South Booster Station project.
Indexes: Agreement, Burke, South Booster Station
Attachments: 1. 060318.pdf
Title
N.   South Booster Station Design Engineering (Resolution)
Resolution authorizing an Agreement with Christopher B. Burke Engineering, Ltd. in the amount of $169,105.60 for design engineering services related to the South Booster Station project.
Body
[Enter body here.]