File #: 150153    Version: 1 Name: Transmission Main, Design Engineering Amendment No. 2
Type: Resolution Status: Passed
File created: 4/6/2015 In control: Village Board of Trustees
On agenda: Final action: 4/16/2015
Title: Transmission Main, Design Engineering Amendment No. 2 Reflecting an increase to the contract with Thomas Engineering Group in the amount of $22,728.37. (DISTRICT #6)
Attachments: 1. 150153 BOT 4-16-15, 2. R 29-15, 3. Cover Page 150153
Title
Transmission Main, Design Engineering Amendment No. 2
Reflecting an increase to the contract with Thomas Engineering Group in the amount of $22,728.37.  (DISTRICT #6)
Body
[Enter body here.]