File #: 130504    Version: 1 Name: Water Transmission Main, Design Engineering
Type: Resolution Status: Passed
File created: 9/25/2013 In control: Village Board of Trustees
On agenda: Final action: 10/3/2013
Title: Water Transmission Main, Design Engineering Resolution approving a contract with Thomas Engineering Group, LLC in the amount of $261,714.32 for Design Engineering Services for the Water Transmission Main (Civic Center Reservoir to South Booster Station). (DISTRICT #6)
Attachments: 1. 130504 BOT 10-3-13, 2. R 149-13.pdf, 3. Contract WA-16-02.pdf, 4. 130504 cover page.pdf
Title
Water Transmission Main, Design Engineering
Resolution approving a contract with Thomas Engineering Group, LLC in the amount of $261,714.32 for Design Engineering Services for the Water Transmission Main (Civic Center Reservoir to South Booster Station).  (DISTRICT #6)
Body
[Enter body here.]