File #: 140144    Version: 1 Name: Electrical Design for Lift Station and Civic Center Reservoir Facility Generators
Type: Resolution Status: Passed
File created: 4/4/2014 In control: Village Board of Trustees
On agenda: Final action: 4/17/2014
Title: Electrical Design for Lift Station and Civic Center Reservoir Facility Generators Approving a contract with Christopher B. Burke Engineering, LTD, in an amount not to exceed $60,694.37 for design engineering services. (DISTRICT #6)
Attachments: 1. 140144 BOT 4-17-14, 2. R 18-14.pdf, 3. Chirstopher B. Burke Eng.Lift Station Eng. Services Agreement.pdf, 4. Cover Page 140144.pdf, 5. cbbel 65% memo, 6. cbbel 95% memo, 7. authorization to bid_signed by VM 942014, 8. EOPCC, 9. MASTER-FOR BID.090314, 10. 140120_090314_Signed, 11. westmore seeco ccdd testing packet 2014, 12. garfield seeco ccdd testing packet 2014, 13. 20 New, 14. 20 Sound Old, 15. 35 New, 16. 35 Sound Old
Related files: 140155, 140221, 140381, 140124
Title
Electrical Design for Lift Station and Civic Center Reservoir Facility Generators
Approving a contract with Christopher B. Burke Engineering, LTD, in an amount not to exceed $60,694.37 for design engineering services.  (DISTRICT #6)
Body
[Enter body here.]