File #: 040212    Version: 0 Name: Eisenhower Lane Reservoir Facility Design Engineering (Resolution)
Type: Resolution Status: Passed
File created: 5/24/2004 In control: Village Board
On agenda: Final action: 6/3/2004
Title: P. Eisenhower Lane Reservoir Facility Design Engineering (Resolution) Resolution authorizing an Agreement with Christopher B. Burke Engineering, Ltd. in the amount of $286,037.04 for Design Engineering services related to the Eisenhower Lane Reservoir Facility. (DISTRICT #3)
Indexes: Burke, Contract, Eisenhower, reservoir
Attachments: 1. 040212.pdf
Title
P.   Eisenhower Lane Reservoir Facility Design Engineering (Resolution)
 
Resolution authorizing an Agreement with Christopher B. Burke Engineering, Ltd. in the amount of $286,037.04 for Design Engineering services related to the Eisenhower Lane Reservoir Facility.  (DISTRICT #3)
Body
[Enter body here.]