File #: 040144    Version: 0 Name: Main Street Underground Rehabilitation and LAPP Resurfacing Resident Engineer
Type: Resolution Status: Passed
File created: 4/28/2004 In control: Village Board
On agenda: Final action: 5/6/2004
Title: Z. Main Street Utility Rehabilitation and Main Street LAPP Resident Engineering Contract (Resolution) Resolution approving a contract with Bollinger, Lach and Associates, Inc. in the amount of $107,814.92 for resident engineering services associated with the Main Street Utility Rehabilitation and the Main Street LAPP Resurfacing projects. (DISTRICTS #1, #2, #4 & #6)
Indexes: Bollinger, Main Street , Underground Rehab
Attachments: 1. BoT RE Agenda Sheet.doc, 2. BoT RE Agenda Sheet.pdf, 3. BoT RE Memo.pdf, 4. BoT RE resolution.pdf, 5. 040144.pdf
Title
Z.    Main Street Utility Rehabilitation and Main Street LAPP Resident Engineering Contract (Resolution)
 
Resolution approving a contract with Bollinger, Lach and Associates, Inc. in the amount of $107,814.92 for resident engineering services associated with the Main Street Utility Rehabilitation and the Main Street LAPP Resurfacing projects.  (DISTRICTS #1, #2, #4 & #6)
body