File #: 230114    Version: Name: Illinois Department of Transportation (IDOT) Intergovernmental Agreement (IGA) for the Intelligent Transportation Systems Project
Type: Resolution Status: Passed
File created: 3/17/2023 In control: Village Board of Trustees
On agenda: Final action: 2/1/2024
Title: Illinois Department of Transportation (IDOT) Intergovernmental Agreement (IGA) for the Intelligent Transportation Systems Project Approval of an Intergovernmental Agreement (IGA) with the Illinois Department of Transportation (IDOT) relative to the Smart Corridors Project along the Butterfield Road (IL RT 56) corridor. This project includes traffic signal modernization, signal timing, changeable message signs (related to traffic messaging), new signage, traffic surveillance, ADA improvements and all other work necessary to complete the improvement per the plans prepared by IDOT. The Village of Lombard has partial jurisdiction of three (3) signals that are located within the project area. At each location, the Village will be responsible for ten percent (10%) of the costs for engineering and 100% of emergency vehicle pre-emption (where applicable). The total cost to the Village for these improvements is estimated at $646,734.00. (DISTRICT #3)
Attachments: 1. 230114 Board Meeting Attachment 4.6.23, 2. R 13-23.pdf, 3. IDOT Intergovernmental Agreement for the Intelligent Transportation Systems Project - Unsigned.pdf, 4. Cover Page 230114.pdf, 5. IDOT Intergovernmental Agreement for the Intelligent Transportation Systems Project.pdf, 6. 230114 Board Meeting Attachment 2.1.24, 7. R 06-24, 8. IDOT Intergoverrn Agreement - unsigned, 9. IDOT IGA.pdf

Title

Illinois Department of Transportation (IDOT) Intergovernmental Agreement (IGA) for the Intelligent Transportation Systems Project

Approval of an Intergovernmental Agreement (IGA) with the Illinois Department of Transportation (IDOT) relative to the Smart Corridors Project along the Butterfield Road (IL RT 56) corridor. This project includes traffic signal modernization, signal timing, changeable message signs (related to traffic messaging), new signage, traffic surveillance, ADA improvements and all other work necessary to complete the improvement per the plans prepared by IDOT. The Village of Lombard has partial jurisdiction of three (3) signals that are located within the project area. At each location, the Village will be responsible for ten percent (10%) of the costs for engineering and 100% of emergency vehicle pre-emption (where applicable). The total cost to the Village for these improvements is estimated at $646,734.00. (DISTRICT #3)

Body

[Enter body here.]