File #: 220369    Version: 1 Name: 22nd Street Manhole Improvements Design Engineering Professional Services Engineering
Type: Resolution Status: Passed
File created: 11/3/2022 In control: Village Board of Trustees
On agenda: Final action: 11/17/2022
Title: 22nd Street Manhole Improvements Design Engineering Professional Services Engineering Approving a contract with Baxter & Woodman Consulting Engineers in the amount not to exceed $28,510.00 to prepare a proposal for the design engineering services for the 22nd Street Manhole Improvements. Previous analysis determined adding a secondary force main to the Yorktown Lift Station, installing a parallel gravity sewer along the existing sewer, extending and straightening the gravity sewer to the connection to the Glenbard Wastewater Authority South Regional Interceptor sewer and the improvements to the 22nd Street Manhole where the force mains tie into the gravity sewer. (DISTRICT #3))
Attachments: 1. 220369 Board Meeting Attachment 11.17.22, 2. R 47-22.pdf, 3. Baxter and Woodman22nd Street Manhole Contract.pdf, 4. Cover Page 220369.pdf

Title

22nd Street Manhole Improvements Design Engineering Professional Services Engineering

Approving a contract with Baxter & Woodman Consulting Engineers in the amount not to exceed $28,510.00 to prepare a proposal for the design engineering services for the 22nd Street Manhole Improvements. Previous analysis determined adding a secondary force main to the Yorktown Lift Station, installing a parallel gravity sewer along the existing sewer, extending and straightening the gravity sewer to the connection to the Glenbard Wastewater Authority South Regional Interceptor sewer and the improvements to the 22nd Street Manhole where the force mains tie into the gravity sewer. (DISTRICT #3))

Body

[Enter body here.]