Title:
|
Charles Lane Basin Improvements Design Engineering Amendment #1
Reflecting an increase to the contract with Engineering Resource Associates in the amount of $25,200.00. The amendment is for engineering services outside of the original scope of contract. A retaining wall is now being required to hold back the floodwaters from the East Branch during large storm events. (DISTRICT #1)
|