File #: 230061    Version: 1 Name: Charles Lane Basin Improvements Design Engineering Amendment #1
Type: Resolution Status: Passed
File created: 2/1/2023 In control: Village Board of Trustees
On agenda: Final action: 2/16/2023
Title: Charles Lane Basin Improvements Design Engineering Amendment #1 Reflecting an increase to the contract with Engineering Resource Associates in the amount of $25,200.00. The amendment is for engineering services outside of the original scope of contract. A retaining wall is now being required to hold back the floodwaters from the East Branch during large storm events. (DISTRICT #1)
Attachments: 1. 230061 Board Meeting Attachment 2.16.23, 2. R 10-23.pdf, 3. Engineering Resource Associates Charles Lane Basin Improvements Design Engineering Amendment #1.pdf, 4. Cover Page 230061.pdf

Title

Charles Lane Basin Improvements Design Engineering Amendment #1

Reflecting an increase to the contract with Engineering Resource Associates in the amount of $25,200.00. The amendment is for engineering services outside of the original scope of contract. A retaining wall is now being required to hold back the floodwaters from the East Branch during large storm events. (DISTRICT #1)

Body

[Enter body here.]