1.0
Call to Order and Roll Call
Meeting called to order by Chairperson Tross at 7:07 PM.
Staff in attendance:  David HulsebergVillage ManagerTim SextonDirector of 
FinanceCarl GoldsmithDirector of Public WorksDave GormanAsstDirector 
of Public Worksand Dave DratnolVillage Engineer.
Richard J.  Tross, John Kaforski, Ken Blakeslee, Dan Mahal and Art Frerichs
Present:
David Arnold and Arthur Kuehl
Absent:
2.0
Public Participation
Clark Adams    720 EPrairie    cadams@azure-tech.net
Paul Ostruszka    297 SLewis
Gary Zullo    292 NLewis    bg82264@att.net    630-620-8111
3.0
Approval of Minutes
It was moved by  Frerichsseconded by  Mahal,  to approve.  The motion carried 
by a voice vote
4.0
Unfinished Business
Vista Pond Elevation
Taken out of order by Chairperson Tross due to residents in attendance at meeting.  
Goldsmith:  reviewed item with committee members.  Goldsmith presented topo maps of 
last storm events to committee and residents in attendance.  Tross reviewed changes 
to the area of the pond over the past yearsincluding CHAW projectplaygroundetc.  
Goldsmith continued with his presentation.  We are still trying to find out why what 
happened did happen.  Gorman:  writing a scope of work for engineering firm for Vista 
Pond.  Reviewed some of the points with the committee and residents.  After speaking 
with FEMAwe can submit a worksheet for funding on this project.  Tross:  have we 
televised what goes from there over to Gatz Pond?  Gorman:  yesand it was clear.  
Kaforski:  how close is the pond in Villa Park to this?  Dratnol:  right next to it.  Tross:  
do not understand why this pond had a problem and Gatz did not.  All indications are 
that this should not have happened at Vista Pond.  We need to find out why it did in fact 
happen.  Hulseberg:  the good news is that we are all on the same page with this.  Staff 
is out there working on this and looking for the solution.  Tross:  did anyone check 
during this storm what was happening at Gatz Pond?  Was the water flowing there the 
way it should have been?  Gorman:  I did drive out thereand I thought that Gatz Pond 
would have been higher than it was.  Further discussion ensued.  Adams:  there have 
been quite a few times that the water has been in my front yard.  Frerichs questioned 
the possible relationship between the Lake Michigan water and the water table in 
Lombard.   Could a retaining wall of some sort be built around the pond/path area to 
hold the water back?  Gorman:  that is not ordinarily what you want to do.  Hulseberg:  it 
would not be cost effective.  Tross:  we can pump the water out quick enough.  It won'
work if the straw is plugged.  Hulseberg:  once we get the report back,  we will have the 
information that we need in order to address the situation.  Tross:  I want to know why 
this happened.  Can we look at how much water we pumped to Gatz Pond over the past 
years?  Dratnol:  not sure if we have the monitoring stations to track this.  I'm not sure if 
we have the data on that.  Mahal:  possibly the slant of the area bringing the water in 
from Villa Park had an effect.  Gorman:  we are looking at that.  Residents requested 
that pumps and lines be kept on hand in case of emergencies that could happen prior to 
the study being completed and changes made to the pond.  They also questioned 
whether the elevation of the pond will be lowered over the winter.  Staff directed to notify 
residents of progress on this issue;  iewhen firm is selectedetc.
Detention Basin Inspection Results for 2008
Taken out of order by Chairperson Tross.  Tross reviewed findings with committee and 
residents.  Gorman reiterated the importance of this program.  Tross wanted committee 
to receive copies of this because in the next few months we will be reviewing the total 
issues of basinstorm wateretc.  Possibly we need to look at getting all of these 
inspected every yearinstead of just 50/60.
September 12-132008 Storm
Action Items and AAR
Item taken out of order by Chairperson Tross.  Gorman reviewed the report with the 
committee.  Goldsmith:  after a survey of many surrounding communitieswe have 
found that Lombard is unique in the fact that we do bring the sand and sandbags to a 
drop off point.
Proposed Changes to Public WorksResponse to Private Property Flooding
Recommendation of the Public Works Committee.
Item taken out of order by Chairperson Tross.  Goldsmith:  asked the committee to 
recommend this policy update to the Village Board.  Reviewed the changes to the policy 
regarding sandbags.  Discussion ensued.  Goldsmith:  with a policywe are in a better 
position to provide service across the board.
It was moved by  Kaforskiseconded by  Blakesleethat this matter be 
recommend to the Board of Trustees for Approval.  The motion carried by a voice 
vote
First Draft:  FY2010-FY2018 CAPITAL IMPROVEMENT PROGRAM
Item taken out of order by Chairperson Tross.  Village Manager Dave Hulseberg and 
Finance Director Tim Sexton in attendance.  Hulseberg:  reviewed memo from Carl 
Goldsmith through himself.  This is just a draft.  We are anticipating that this could be a 
3-year window.  We are going to push off what we can.  We need to be prepared for 
some things that may just come uplike Vista Pond.  Hulseberg:  expanded on the 
changesetcto the CIP.  We are buying 513 SFinley.  Also trying to acquire property 
next door.  We are trying to keep our services going so we need to move some money 
around.  Hulseberg:  reviewed Capital Bill in Springfield.  There is still $billion out 
there.    Tross:  $million in street lighting on Main St. - is this really practical at this 
point?  What about the money we need for the streets?  Pretty soon we will not be able 
to resurface some of these.  Kaforski:  biggest concern is the general maintenance.  
Seal coatingconcrete rehabetc.  Tross:  even the $million for the salt dome.  We 
need to see what streets have been donewhat streets still need to be doneand 
change some of the priorities.  Hulseberg:  understand what you are sayingand we will 
address this situation.  Tross:  right-of-way beautification out of Hotel/Motel.  Need to 
add more to the sidewalk program.   Tross:  want a specific amount as far as concrete 
and asphalt program.  We want to know what streets are proposed to be done.  Dratnol:  
where should we go with the concrete rehab programwhat streets do you want to be 
doneTross:  really talking about the asphalt program we need to follow through with 
this to keep the streets up.
Proposed Policy for Street Side Mailbox Replacement Impacted by Snow Removal 
Operations
Tross:  want to put this off until the conversation takes place with the Village Attorney.  
Liability is still an issue.  Goldsmith:  will set up a meeting with Tom Bayer.
It was moved by  Kaforskiseconded by  Mahalthat this matter be tabled.  The 
motion carried by a voice vote
5.0
New Business
6.0
Other Business
7.0
Information Only
Project Status Report
Kaforski:  status of Old Towne project?  Dratnol:  we are trackingand unfortunately they 
are not where they should be.  Kaforski:  every time I go by there it seems like nothing is 
going on.  Tross:  it doesn't always have to be the lowest bidder being awarded a 
contract.
Change Order Report
Engineering Monthly Report
8.0
Adjournment
It was moved by  Frerichsseconded by  Mahalto adjourn at 9:20 PMThe motion 
carried by a voice vote