Public Works Committee
Village of Lombard
Village Hall
255 East Wilson Ave.
LombardIL  60148
villageoflombard.org
Meeting Minutes
Trustee Richard JTross-Chairperson
Trustee Jack O"BrienAlternate Chairperson
John KaforskiArthur KuehlDavid Arnold,  Art Frerichs,
Ken Blakeslee and Dan Mahal
Staff LiaisonsWes Anderson and David Dratnol
7:00 PM
Village Hall Community Room
Tuesday, June 13, 2006
1.0
Call to Order and Roll Call
Meeting called to order by Chairperson Tross at 7:04 PM.
Richard J.  TrossJohn KaforskiDavid ArnoldKen BlakesleeDan Mahal and 
Arthur Kuehl
Present:
John O'Brien and Art Frerichs
Absent:
2.0
Public Participation
3.0
Approval of Minutes
It was moved by  Kaforskiseconded by  Blakesleeto approve.  The motion 
carried by a voice vote
4.0
Unfinished Business
5.0
New Business
060307
M.   South Broadway Improvements Change Order #(Resolution)
Resolution authorizing Change Order Noto the contract with MQ Construction 
Company reflecting an increase of $79,036.12 for construction services associated with 
the South Broadway (Chase to Westmoreproject.  (DISTRICT #5)
Dratnol:  reviewed change order with committee members present.  (NOTE:  correct 
change order amount in Legistar. )  Kaforski:  extra manhole?  Dratnol:  yesit was 
buried.  We did have an indication that something was thereso we did think it was 
possible that the manhole was there.
It was moved by  Mahalseconded by  Kaforskithat this matter be recommended 
to the Board of Trustees for approval.  The motion carried by the following vote:
Aye:
Kaforski, Arnold, Blakeslee, Mahal and Kuehl
5 - 
Absent:
John O'Brien and Frerichs
2 - 
060334
In-House Grind Overlay Public Works Management System
Anderson:  explained the grind and overlay programwhich is occurring presently.  First 
piece is annual maintenance.  Second piece consists of what happened after 
construction last year small areas here and there.  Usually occurs after Taste of 
Lombard.  Reviewed power point slides with committee.  Arnold:  any add in for white 
topping in this?  Anderson:  we will be putting in white topping with the next CIP.  Arnold:  
where are we price wise with asphalt compared to concrete?  Dratnol:  concrete 
driveways are coming in a lot cheaper than asphalt ones.  Anderson:  white topping still 
requires a good basethe street needs to be in good condition.  Tross:  asked for 
explanation of time frame of restoration policy.  Anderson responded.   Kaforski:  n/
corner of Martha and Washington new handicap ramp is already lifting up.  Tross:  
asked Anderson to copy BOT on this with a memo.  Arnold:  do we have any budget for 
brick paver maintenance?  Anderson:  we just started this year with $5000.00.  Arnold:  
what do you see as problem?  Anderson:  varies.  Library area is actually lifting up.  
Downtown some of the bricks are cracking.
6.0
Other Business
7.0
Information Only
970045
Project Status Report
980212
Change Order Report
Tross:  advised at BOLI about SA219 problems.  Dratnol:  replacing existing sewer.  It is 
updown and all around.  Cannot even televise.  On Ahrens from Roosevelt to Morris.  
Real bad conditions.  When sewer was originally constructed there was a fatality.  
Contractor is having a lot of problems.  We are looking at several different possibilities 
there.  May have to move or install new water main.  Soils on Morris have been good.  
All cost will be on the Village.  Dratnol updated committee members on ongoing projects 
throughout town.
030008
Engineering Monthly Report
060335
Main Street STP Improvement Plan and Profile
Dratnol:  provided committee members with preliminary design reports.  Limits of project 
remain from Roosevelt Rdto concrete section of Wilson Ave.  Tross:  asked committee 
members to look at area from Central to left turn bay at Wilson.  Now might be the time 
to expand this project and get some ingress/egress from Glenbard East High School.  
Dratnol:  tossed out some ideas.  Need to tread softly on project plans because of 
funding.  We can add in projects that the Village is funding at 100%.  State has to 
budget the entire cost of this project.  We can plan out what needs to be done and have 
time to work out things out with the high school.  We can do widening at west side of 
Main Stto achieve lanes.  Tross:  if you know there is a defect in a planIDOT will not 
change?  Dratnol:  there is no defect in this plan.  Kaforski:  what Dave is saying is true
we will lose this funding and go back to page if we try to change things.  We can still 
get it donebut need to get school on board and set up as separate project for the 
Village.  We proceed with this project.  We do what we need to do right now so that 
when this project is complete we can easily transition to the next phase.  Consensus of 
committee to coordinate with Glenbard EastCommunity DevelopmentPublic Works
T&S Committee.   Anderson:  there is a stretch of right -ofway by the large house by 
the high school that may be a problem.  We have some right-of-way cleanup that we 
need to address that would be better handled as a Village project.
It was moved by  Kuehlseconded by  Kaforskithat this matter be recommended 
to the Board of Trustees for approval  Recommendation to increase the scope of 
this project and to obtain a proposal from Christopher Burke Engineering for this 
as a totally separate projectThe motion carried by the following vote:
Aye:
Kaforski, Arnold, Blakeslee, Mahal and Kuehl
5 - 
Absent:
John O'Brien and Frerichs
2 - 
060336
Railroad Right-of-Way Issues between Grace Westmore
President's Committee T&S Committee.
Anderson:  gave committee feedback and recommendations that came out of 
President's Committee meeting.  At this point PWC should just be kept advised of what 
is going on.  Anderson putting together a proposal of estimate for the bushes.  Keep on 
the agenda every month.  PWC will meet in July.
8.0
Adjournment
at 8:40 PM.
It was moved by  Mahalseconded by  Kuehlto adjourn.  The motion carried by a 
voice vote