Call to Order and Roll Call of Members
Chairperson Donald FRyan, Commissioner Stephen Flint, Commissioner 
Ronald Olbrysh, Commissioner Ruth Sweetser, Commissioner Sondra Zorn and 
Commissioner Martin Burke
Present:
Chairperson Ryan called the order of the agenda.
 
MrHeniff read the Rules of Procedure as written in the Plan Commission By-Laws.
MrHeniff stated that staff had been informed that there were questions about PC 03-22 
and that there may be an issue regarding the validity of the petition filed.  Staff feels that 
this is an issue between the association and their members and should be addressed as 
such.  Therefore, staff makes a recommendation that PC 03-22 be continued to the 
August 182003 Plan Commission meeting.
Public Hearings
030245
Patrick Zuroski, project manager, general contractor  and developer for the proposed 
facility.  951 S7th Street, Rochelle, 61068.  He displayed a color rending of the Main 
Street Market concept for the renovation of the building.  MrZuroski /DPSA 
Companies/on behalf of Kraupanithi, Inc.  devsubject property.  Pursuant to submittal 
requesting the village an amendment to the existying cu on the west side of building 
attached to previous site planhe also mentioned the variations they are requesting.  1st 
amendment is auto service.  the first service has vacated the property and asking that 
the west side of the structure to have similar use.  he mentioned that side is all right for 
this use.  2nd amndement sales mulch, beverages, in specific areas on site.  sales 
consistent with other stations.  will have no impact on adjacent proeprty.  1st variation 
the petitoner wants to install a new brand sign in the same location similar hiehgt and 
width.  2nd var increase so that he top portion of the sign top part and bottom part 
of sign will measure.  he described the sign and feel that the surface area of the xistsing 
sign is same as proposed but slightly larger.  3rd var the petioner is reqnon 
illumiated citgo sign for the north and east side of canopy.  reqan illumatined main 
street market placed over store and he described.  he noted the idifference on the 
canopy is the citgo logo is now non illuminated.  the petitoner submitted plans and 
r3eceived initial comments from the BIS.  construction of the store will proceed upon 
receipt of trhe plans.  limited demoliton permit.  the project has net or exceeded village 
codes excedpt for their requests tonight.  petwill enhance north side of property with 
landscaping.  repave where paving currently exists.  no further plans for anything elase.  
feel it is a good neighborhood image and fits well.  
 
There was no one to speak in favor or against this petition
 
Speaking against the petition were:
 
Peter Zakos, 618 SMain Street.  MrZakos stated he has lived there for 30 years and 
his proeprty is located south of the gas station in question.  He gave the history of the 
canopy and mentioned that at previous meetings it was established that the canopy 
would measure  22 40.  He asked if the petitioner would be expanding the canopy to 
make it larger.  MrZakos also inquired as to perimeter lighting.  He mentioned the light 
poles by his drieveway and wanted to know if those would stay.  He referred to the 
pictures he handed out to the to the Commissioners which showed the standing water 
he gets.  MrZakos stated that all downspouts are directed to that area and his flooding 
problem has gotten worse over the years.  The pictures also show debris he receives 
which gets washed into his yard.  He is concerned about those problems, the 
neighborhood, and having a 24-hour facility next to his property.  
 
Joe Grimes, 25 EMadison Street, stated that project is being brought back as a result 
of certain issues and he wanted to speak about these issues and make sure they are 
addressed.  He wanted confirmation that the canopy and number of gasoline pumps 
would stay as is.  He was concerned about the canopy lighting and he felt it could be 
brought down to 50 footcandles.  He asked about the hours of operation mentioning that 
at previous meetings the petitioner stated that they would be shutting down from 
midnight to 4:30 a.m.    He wanted stormwater runooff to be addressed as well as the 
landscaping and fencing.  He asked if they were going to replace the fence on the south 
and west side.  He thought there was mention of a  10'  tall fence at one time and 
wanted to know if that was going to be the height.   He thought the landscaping was 
minimal and the petitioner should get larger bushes.  He was concerned about traffic 
and safety specifically the north entrance.  He stated there was talk about making it a 
right in right out or closing it.  He believes the traffic study is inadequate as it doesn't 
address traffic around the site or in conjunction with the schools but just talks about 
flows of traffice in and out of the facility.  MrGrimes stated he was very happy with the 
building redesign and thought it was great but he thought brick should be the material of 
choice and they should be required to use it.   He feels that since the neighborhood has 
made concessions, the petitioner should also
 
Petitioner rebutted.  wanted to so through some of the issues are here to address the 
issues of the cu and the variations.  not asking fgor anuything additional then in the 
petition.  feels all these issues have been addressed and they are not specifically tied to 
our request at this time.  keep in mind that they are exceeding village ordinances and 
want to be good neighbors.  
 
Heniff gave staff report.  appeared before pc in may with no recommendation and went 
to bot.  they sent back.  he reiterated the request.  the pumps and canopy are legal non 
conforming as they are today.  Three signage variations associated but modified.  they 
moved a number of signs.  the new request changes from to and 138 to 94 s.f.  the 
underlined village code so by right they can do signs by right they are requesting 4.  
freestanding sign in clos.  staff doesn't feel the sign would create a clos issue because 
of the roadway profile.  canopy sign restricted to non illimunated letters.  same 
recommendation.  modified recommendation to address those concerns amending the 
petition.  staff feels that the conditions are appropriate.
 
Commissioners:
SF hours working was that incorporated in here?  BH it was discussed in april pc .  if 
approprate they could consider that but staff did not have in their recommendation.
 
RO like the design is an improvement.  absent at the april meeting.  couple of issues.  
wanted to be good neighbors, not aware of a potential stormwater issue.  need to be 
addressed and correcting the s/w situation.  the other issue is the lighting issue, does 
the lighting meet code.  BH introduced DG  for s/w issues.  Lighting would fall under 
same requirements that any business would have.  he gave code requirements.  more 
of a code enforcement issue.  if they modify the lighting, they would have to submit 
photometric planRO we don't know at this time if it meets code or not.  
 
RS a little disturbing that the discussion that we had in the april meeting are not 
incorpoated and since no recommendation those were not forwarded.  Take some of 
thse issues, the landscaping the greates degree possible and be rmeinded, and about 
the fencing, the traffice, the north entrace specifically about the tankers, and the traffic 
study didn't indicate any problems.  concerned about the building materials and favored 
all brick xterior.  Requested what the prior petition contained.  
 
DR is the canopy staying exaclty as is.  pet no alternatives other than minor reqpris.  
DR hiehgrt and size will stay the same.  Pet yes.  DR # of pumps will stay same.  PEt 
yes but the configuration may change.
 
DG pes of Village Village code parking lots is resurfaced or rebuilt staff will look at 
anyimprovements to bring it up to code and restriping 25%.  If 50all that and 
landscaping, drainage, etc.  With the minor patchwork is a matter of surface area.  the 
application would be limited to striping.  if less than 50 we could work with you to see 
if you could handle that to your satisfaction.  pet is looking to resurface the entire lot?  
pethaven't submitted anything yet.  its their intention to make improvements but the 
size and confirguration not decided at this timeit is not intention to repave the entire site 
at this time.  we are decreasing the impervious surface area of site to allow for additional 
absorbancy.  
 
DR current hours?  pet no current hours of opration  DR intended hours.  Pet;  
operate \withing code.  
 
RS at last meeting the owner agreed to hours not have any oeration between midnight 
at amand correspond with hours of convenient store across the street.  
 
BH addressed the conditions that talked about pmn and closing.  hours of operation 
11-5am, final analysis midnight to 4:30 went to the board.those were specifically added.  
direction was given to add more landscpaing but not a condition.
 
DR what is code for hours of operation.  BH Village doesn't have nay codes to hours of 
operation.  
 
RS what is reqfor a fence.  BH solid redwood fence and gave location could that be 
increased in height .  8' is max being mindful of clos issuesRS is that what it is now?  
BH i believe 6.
 
RO water issue concerneedd about this issue.  this is the time to correct it and this is 
our opportunity to do something about it.  Village staff should take a look at and 
determine if there is a problem and be corrected by pet.  DG staff did look at issue, 
water is running off solution is higher elevation or tieing into storm sewer.  BH talk about 
access in and out of site this is from the traffic consultant.  as it relates to north access 
dirve.  he quoted the study.  ifthe pc feels it necesary to sign it or mark it that would be 
appropriate.  the other issue was what the increase in the trips would be.  the petis 
taying with the don't increase trips to site.  they note that conveience mart traffic is 
pass by and not destination orientedthe conveience store is a  permitted use and there 
may be some additional trips generated but what is the fueld discpesning impact.  
 
RS exterior and the building material and what it is and percentages.  Pet we 
submitted a full set of plans and facility will be construed as on color rendingering the 
extiero wil be 100 brick and wraps around the west sectionthe south side is concrete 
block and shielded by landscacping and will retain that surface and paint the same color.  
Green canvas awnings and one exterior sign.
 
1the conditonal uses in addition to the coibnditionsto include the folliwng:  that the 
hours of operation are no greater than midnight and don't begin before 4:30
 
The a photometric plan be submitted.
 
Drainage plan be created and submitted subject to Director of CD and the opeople 
informed of that .
Increased landscaping to the maximum
6'Solid fence on the west and south be maintained.
fuel transport occur between 7am and pm or wahter was agreed to previously.
It was moved by Commissioner Sweetser, seconded by Commissioner Olbrysh, 
that this matter be recommended to the Corporate Authorities for approval  
subject to conditions.  The motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Zorn and Burke
5 - 
Enactment No610 SMain Street
030455
It was moved by Commissioner Olbrysh, seconded by Commissioner Sweetser, 
to continue PC 03-22 to the August 182003 Plan Commission meeting..  The 
motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Zorn and Burke
5 - 
030454
Mark Janek reprsenting Insignia Homes.  A fewmonths ago he appeared about this 
project and now for the public hearing.  The property under contract is at end of Fairfield 
and gavie location south of the detnetion/rention basin of Roosevelt lRoad.  Property 
has history of development approvals.  Curently condo buildings on south and west, on 
east single family homes, north is commercial.  proeprty wasinteedned an extension oof 
current condo.  mentioned 66 buildings that were to be approved.  the facilities went into 
disreapr and if the assocwanted to pay for the repair of pool, tennis courts and assoc
saidno.  came in with t/h proposal with 45\46 units and showed the elevations.  the pc 
gave us comments about hte plan and archand now 40 units as well as architecuture.  
arch changed a little to address the issues is the end of theunits facing the single family.  
chanted to end units for a two level unit to have a different product for a different buyer.  
all units face the exterior property lines.  all rears of building where garages are they are 
hidden from site and the possiblity of trafficc congestion.    located denteion basin on 
west side and will not touch theweland part of site.  will have aw walking path on both 
ends of property and open to whomever is back there.  Conp plan calls for 10-11 units 
per acre they are at 7t hey have reduced density.  average sale price is around 
220-230 per unitthey believe that th4ese t/h are designed and built to have entirely all 
area owned by association.  no rear yards not attraactive for children.  have numberous 
professions here if they have any questions.
 
No one in favor
 
Against:
Steven Garrett 440 13th place, hh subdivwest of properosed developmnt.  will impact 
neighborhood greatly.  Sewer plan will not work.  having a problem with that sewer 
bubbles over repeadly with raw sewage that goes into his backyard.  thius is caused by 
high point center property and gave history of the stromwater issues.  they were 
promised flood reflief and never receeived it except for a dike.  water lines will run over 
each other that won't work.  traffiic concerns him.  doesn't like the Rnot congruent with 
muylti family structure.   flood water management code CLLMR must be issued by fema.  
have not seen that.  rentntion bponds will areadly be taking the easgate highland 
meedical water in addition to what is there alrady.
 
Vincent Lopez 1371 SLombard Ave., been there for 15yuears.  Brief comment did 
not buy into the neighborood, couldnt afford lobmard at time because of taxes and 
moved into incorporated.  he mnetioned the schools that their kids go to.  loves the 
neighbrohood like the quitness and country atmosphere,  they have trees and green 
grass.  he welcomes change but not compromising their issues.
 
Edward Bubek 143 SGrace back gate to use street as thoroughfare.  they should 
make their own adjustment and where will all the construction equipment go.  likes his 
neighbrohdood safe for kids
 
Shannon Smith declined
Gary Harrison 1361 SLombard what exactly is being annexed.  Brought a plat of 
survey and wants to know if they make a  private road annexed.  Do you plan on taking 
those proeprties for the private road.  Where is s/w going, will the retntion handle the 
sever storms?  is there a backup plan for the tention if it fails?  Will the village be liable, 
will lombard take measure to ensure that doesn't happen?
 
Michael Friga 1527 SHighland, are here to voice our concerns and be neighbors that 
will affect our quality of life.  still inapproiate around single family homes.  project should 
meet certain criteria like s/w, impervious surface, nature of arch, increase in traffic and 
other safety issues.  also the long term status of these units like abseetism landlords.  
 
Robert PcPherson declined
Analyese Meyer 261 pINE LANE concerned about flooding.  have problems arleady 
wioth flooding.  when fairfield becoames part of lombard will they take care of the 
drainage issue.
Steven Longhorn 1410 SLombard concerns about flooding prolem and that topo 
survey .  added traffic to radway, if access is from grace street.  don't want to be 
incorporated.  Tarrffic flows what direction they are comingfrom?  Tremenoud amount 
of children crosisng that roadway.  putting the condos will icnrease traffic on highland.
 
Gene Harrison 1331 SLombard echo the comments on his neighbors.  didn't receive 
any notice that it was being heard tonight.  Surprise to find that it is not a road and was 
built illegially.  against annexation as well.  
 
Jerry Voss 1391 SLombard on the location map sent to him by village it shows 
subject property like it comes up to his back door.  the road managed by township so he 
is confused.  He has lowest yard in his section.  Water drainage he cannot add or 
detract from his yard because he is in a flloodplain.  Wonder why he can't do anything to 
keep a swimming pool out of his yard but a contractor can do what they want.  His kids 
play on other side of fence but with increased amount of traffic.  feels there could be 
300-400 more people and the poeple who buy into the development they can only go 
one way and after thedevis completed and they open up the access road onto Grace 
Street.  Doesn't water backed up any further in his back yard.  Water right now just sits 
there.
 
Ben Swagga 1517 SStewart corner lotopen up street we have problems.  single 
family homes 1/acre 3/acres right now.  Worried about the maintenance of the 
condos.  No tax base here.  Keep the single family homes with bigger lots.  Against 
annexation also.  we are not here to cause problems and won't fit the profile.  dont open 
up grace street.  
 
Myra Murill 1471SLombard lived in Chiago, burr ridge and hinsda.e and took years 
to find a hosue here.  totally agianst the probject.  installed 2nd sump pump in house 
because of water.  traffice is another issue.  are there certain legal procedures to follow 
to let neighbhood folks know what goes on in their neighborthood.  FAARS have to go 
for variances.  As far as he knows only people were notified of the hearing.  
Questioned the public hearing procedures of notification.  Questioned the main access 
and garbage pcikups He mentions the staff report to change the setbakcs mentioned the 
developer can change those if they want.
 
Gloria Herrera 1380 SLombard one block west of Grace and in front of Jerry who 
talked about how is losing land.\ bea\cause of the accessing of the road.  concerned 
about drainage alsoconcerned about annexation into lombard.  worried about the 
property taxes feels she will have to contributre in order to get a fix to the water problem.  
Loves here neighborood because of the space and her neighbors.  plese don't change 
her neighborhood.
 
Walter Cowa completely against the development because it will be too crowded and 
too close to their building.  the plan doesn't show on plan how many feet the property is 
from the building.  He mentioned a reservoir and a safety issue of falling into it  will 
they put up a fence and how will it look.  He mentioned how they used the pool and 
tennis court and sauna and that they pay for insurance.  then they asked for more 
money for maintenace.  They lost the value and now they lose the value again  Can't 
undestand him or where he is going with this conversation.  
 
Lydia Jinsysky mentions the petition on PC 03-22 .  Chairperson Ryan mentions that is 
the wrong petition.  they have reviewed the proposal and plans and object to the deve.  
when the property orignally deveit was comtemplated that a story building with 
amenitites would be constructed between thebuilding and only buildings built.  
mentioned their disrepair.  mentioned the loss of the valuewith new devel they will see 
a further decrease in value to their property.  mentioned the proposed detention pond 
and will be immediately adjacent to their property.  Difficulat traffic patterns without 
additional ingress and egress.  Louis university and montini the congestion will be 
excessive.  increase in density will not be good for the people.  the proposal ignores 
them but puts them int he rear of the new development.  drastic change in 
demographics with the community
 
Ramona Garrett 440 E13th Place  environmental scientiest about theenvironment.  
took a look at the extent of th wetlands in area.  want the area to be protected if deve
gets built the wetland will not be protected.  Retntion ponds and mosquitos from 
standing water and needs to be addressed.  Mentioned an aerator but the ponds are too 
shallow.  .  Consider the bigger picture mentioned the highest and best use of the 
proeprty and should be some benefit for a large group of people.  don't see a benefit 
here.  traffic study doesn't consider grace and 15th street.  they like their big lots and 
country feel and like the different types of birds and like nature and want to make sure it 
is still here and wyhere will the animals go
 
David Bardack York center cooperative problems with plans and with nassets.  866 lf 
and 31,00 s.fand producers a dense housing area.  In favor seeing the wetland being 
preserved but the extent to drainage coming east and south and hh area and this 
something that must be considered.  water detnetion areas on property not fenced and 
raisese safety issues.  North of barrier at end of Fairfield, York t/s deposited large 
amounts of concrete  should be fenced to keep the garabage at bay.  Inventory of trees 
to be maintained and glad but osme of the trees are ont he concrete but on the coop 
area.  Finally lights, on fairfield and these will be the old style village lights, concerened 
about the direction of the lgihts.  
 
Mark Janek rebutted.  most people to the west of their property.  he will explain the s/
flow.  their site flows from south to north toward the basin area.  the stream flows flows 
from west to east.  their proeprty downstrem from neighborhood that talked tonight.  their 
flow willcontinue east.  he doesn't believe that they will affect anyone upstream from 
them.  Concern about using Grace and 15th place, their entire site is focsued toward F/f.  
no access to Grace.  will  use the access driveway as thye will be owing half of that 
property.  the gate is for emergency purposes only.  their traffic study is only for f/f as 
that is what they will access.  7increase on f/f per study.  peak hours 27-30 cars at 
peak tiome.  most of the popel at their condos will be working and not at home.  
lDetention basin, mosquitos, the depth ob dettention basin and are designed by Dupage 
county standards and vol staff, they detain and they go back down to their normal level 
which is about 6-8of water.  they will plant a native mix to encourage anmials which eat 
the mosquiot larvea which is their designWetlands will not be within 25' feet grading 
wise and not touching flood plain or they mitigating flood plain on site.  the part they are 
building on will have fill, thenatural part of site they will leave alone.  Losing lands 
doesn't take into any properties on grace just th epiece they have under contract and the 
condo association property.  they will hook on to Chicago waterthe watermians cross, 
watermain can cross each other they are not sanitary sewer pipes, they are meeting 
village and dupage county codes.  Lot coverage is only 33-35which is extremely low 
because of the few units.  Amenities they are gone from the condo assocproblem is 
that tings happen with that property , they had a choice to ppay for the amenitites to be 
rebuilt and they said no.   But he will make a project that will help them out and will effect 
someone but feel this is a ration plan and feel they have more than followed the code.
 
DR the intention that Grace street will go through.  Pet.  no development along grace 
street.  we have a chipped path close to grace street butr no imporvements to grace 
street at all.
 
RS don't have control over the gate.  Wants to know who does.  Pet0the condo 
assocthat is their gate.
 
Staff report
Presented the main points and willturn over the DG to address the s/w issues.  Insignis 
Homes petition exclusively.  gave location of property.  proposing building 40 unit 
building replace a previous development proposal approvedin 1979.  to clarify dupage 
county has it zoned for Rwhich menas someone could go to dupage county as a 66 
development as a matter of right.  PC reviewed earlier versions at their workshop and 
raised concerns of s/w, wetland, guest parking, and other issues that the petihas 
addressed.  Planning comments continugint achieved thru north side and is ultimately in 
Lombard.  annexation considerred by BOT.  The CP as medium denisty residential and 
proposed developis less or 7.and is consisent and is lower.  Zoning Ordinage R
to Rcu approval and deviation to setback and cu for more than strucutre on lot of 
record.
Rezoning automaticlly to R1, want R4.  single family residential is that is has Rzoning 
and then there is a map amnedment.  staff feels it is appropriate.  
Cu for P D addresses site specific issues.  property constrained on orth side by 
enbironmental issues.  
Design issues Read off of page 5mentioned the alternative elevations.  the private 
access dirveway a loop road back to f/f and maintained by a created association.
Transportation only served by F/F ave.  33' public right of way, immediately est of that 
is another easement which is an underimproved roadway.
Traffic study done and summarized the findingsNo traffic signals or improvements 
needed.
Landscaping tree inventory Fron yard setback for a roofer over front porch that will 
goalong f/f avenue.Read off of page 7.
CU -more than building on lot of record seven buiildings on subject property.  will be 
a homeowners association.
Sub & DeveOrdinance willimprove f/f improvemnets to full length of roadway.  hh will 
continue to provide sanitary sewer.  
Surrounding land uses compitable and provides a transition.
Turned over to Dave Gorman that he has been working on.  making known that there 
are new floodplain maps put out by FEMA.  come to village or check out on website.  no 
proposed encrochment into floodplain with this development.  only to wetland buffer
there is a year maintenance monitoring period and they are involved with permitting on 
that.  Surcharging of hh sanitary sewer.  village not aware and will talk with them as they 
will be providing sanitary swervice.  Watermin will be looped from 17th street tof/f and 
back.  it will go alongside the h/hwatermain.  basins will be wetland bottoms and should 
not be a fear of drowing and have talked with insignia about split rail fences around 
them.
 
BH final issues to parking area staff notes that each unit car garage and spaces 
outside garage and 15 additional spaces in didfferent areas.  Hidden Valley condos 
has suffienct parking.  
architect compitability the petitioner has developed a new model for what they would 
like to do 
 
Staff recomended approval subject  to conditionsstaff did look at apo list we didn't send 
out to 19 properties immediately west of subject property notifing them of themeeting.  
the subject prperty is singed with a public hearing notice
 
Commisisoners:  RO notification concern  BH notification all property owners 250 ' of 
a subject property public hearing with a sign.  RS definate improvement based on 
workshop.  we have general consdieration of all aspects of development anticipate that 
if subject property remained Rthey would not be attractive to buyers as to proximity to 
condos.  The gate is under the condo assocwhat we can do to mandate that gate not 
be opened for the construction process but that would be her recommenation.  
 
RS if gate opened it is not by the village or insignia or opened by entities has no control.  
interms of the rate of incrase as to figures??? this subdivision will be of a shoddy value?  
not sure what she is asking.  Barrier/split railalong the detention?  DG thse basin 
mentioned the slopes of the basins.  RS improvement of f/f the north end blocked to 
prevent dumping.  BH yes definately, it does have merit don't want fly dumping.  would 
be good to put a barrier RS water lines crossing DG will run paralledl to exisint main 
owned by HH.  similar situation south on f/f.  RS so they won't cross.  DG don't believe if 
they crossed it wouldn't be an engineering problem
 
RO not against development but think the commisison has to do is to take account 
impact on neighbors, traffic issues, water and the arch compatibility still a major problem 
for him.
 
DR agianst alot at first but the work that has been done is very good but a developer 
could come in right now and put up a 100 units w/o a public hearing so this developer 
has come before us, listened to our concerns twice, reduced the denisty and answer 
some of the problems and did a good job of it.  try to do what is good  for the village o  
lombard and i think it is a very nice development which will improve the lookds and 
value.
 
RS i don't anticipate thingsto go wrong or go badly.  don't think there is a precedent for 
it.
 
SF this is a high quality development and look it as a transition.   it could be much 
denser and it is a good compromise and devgone out of his way to make it a good 
development.
 
RS neighter situation is possible lay of land dictates the flow either flows east or n/e is 
that correct? 
 
BH clear up that there were additional annexation above and beyond.  poperties 
that are under contract with insignia and he rad the state statute.  he mentioned the far 
end of the public right of way.  no single family properties annexed with this petition.
 
MB f/f is it just the section immediately to the east.  BH yes.  can't hear him BH yes.
 
5.  that all construction traffic will use f/f avenue as for ingress/egress
6.  that split rail barrier will be put up surrounding the wetland areas including the 
detention areas.
7.  that particular attention paid to blocking the north end of f/f to improve dumping.
8.  any drainage issues caused by the development be addresed by Director of 
Community Development.
It was moved by Commissioner Sweetser, seconded by Commissioner Zorn, that 
this matter be recommended to the Corporate Authorities for approval  subject to 
conditions.  The motion carried by the following vote:
Aye:
Flint, Sweetser, Zorn and Burke
4 - 
Nay:
Olbrysh
1 - 
Enactment No5360 5364
Chairperson Ryan requested a recess at 10:10 p.mand reconvened the meeting at 
10:20 p.m.
030457
Eugene 1808 Darien,  proposing a variation for the sign height.  was here before before 
for freestanding signs which was granted.  the actual lettering isonly 60.feet, they are 
acutally proosing to lower the sign and more pleasing to roosevelt road but need height t 
o locate the Lincoln Mercry dealership.  He passed round pictures of the differences in 
signs?????  5.acrte facility and think a sign of that size would beadequatelowering 
the sign more than feet from what it is.  
 
No one to speak in favor or against the petition.
 
idrc staff report requesting deviations to the proposed sign as part of the expanion.  
wants to install a new freestanding sign.  he gave the history of the signs which meet 
code and now want relieft to remove and replace the brand sign however the new sign 
would not be the height or area of code therefore this hearing.
 
Planning completed the expansion for the quick service bays and additionals service 
space.  Comp with sign ordinance did receive cu in 2002 and a deviation for a number 
of wall lsigns.  he referred to the table on page comparing the code vsrequest.  signs 
legal nonconforming when they take down the sign a new sign has to meet code or get 
relief to put up sign.  Auotmobiles do propose unique signage issues.  He gave staff 
comments relative to the standards in regard to placement of signs.  Amortization in 
the past inventory of non conforming signs and identified the L/M sign as one.  the 
request would be inconcsisent with the village board and could set a precedent
Hardship ordinance is not causing the hardship and has enought signage w/o relief.  3.  
could decrease t6h eaesthic appeal of Roosevelt Road.  When variations are granted 
they run in perpertuity with the land and they set a precedence and such recommnds 
denial
 
?Commissioners:  DR this sign is replacing the current one.  how big is the current one 
compared to the new one?  BH existing sing is 35 the new at 25'11' sign surface is 154 
s.fand proposed 145 s.fsf.f less in terms of areas and over 5' in terms of height less.  
DR they were notified that they had to bring it into compliance.  BH we found a letter in 
the file stating that.  
 
DR we approved the other free standing signs and wall signs.  BH yes.  Dr so they have 
years left to leave it or bring it under conformity.  
Staff recommdns denial.
 
BH mentioned that if the petitoner wasnt to appeal the decision they must submit a letter 
in 10 days and then will go to BOT>
It was moved by Commissioner Flint, seconded by Commissioner Burke, that this 
matter be denied.  The motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Zorn and Burke
5 - 
Enactment NoOrdinance 5338  500
Business Meeting
Chairperson Ryan convened the business meeting at 10:35 p.m.
Approval of Minutes
The minutes of the June 162003 Plan Commission meeting were approved by 
unanimous consent of the Plan Commission.
Public Participation
Chairperson Ryan asked if there was anyone present who wished to address the Plan 
Commission regarding anything not on the agenda.  No one was present to speak.
DuPage County Hearings
There were no DuPage County Hearings.
Chairperson's Report
Chairperson Ryan deferred to the Senior Planner.
Planner's Report
William Henniff, Senior Planner, stated he had two items.  First, he advised the 
Commissioners that staff had received notice of a DuPage County petition requesting a 
conditional use an oversized garage for the property located at 1021 SColumbine.  The 
petition stated that the garage was to exceed the maximum allowed gross floor area for 
an accessory structure (detached garagefrom 850 square feet to approximately 1,139 
square feet.  Being that the property is located within the Village's ultimate boundaries 
and due to time constraints, staff made a recommendation to the Board of Trustees last 
Thursday that the Village adopt a Resolution of Objection as the garage would well have 
execeeded our code.  The Board approved the Resolution and staff will be submitting a 
letter of objection to the County.  
 
Secondly, MrHeniff noted the need for a second Plan Commission meeting in 
September.  He proposed September 22 and asked the Commissioners if they would be 
available on that date.   MrHeniff mentioned that the hoteconference center  will be 
workshopped at the July 282003 special Plan Commission meeting and staff 
anticipates a filing for a public hearing for the hotel/conference center in September.  
Due to the complexity and enorminity of the project, he mentioned that staff felt it might 
be prudent to schedule another meeting in September to address any other concerns 
relating to this project as well as for any other petitions that might come forward.    
 
MrHeniff stated that there would only be one meeting in August and asked if their were 
any objections to beginning the September meetings at 7:00 p.minstead of 7:30 p.m.  
Commission Zorn indicated that she would be unavailable on September 15.  
Commission Olbrysh indicated that he would be unavailable on September 22.  
Commission Olbrysh also had mentioned his concern of having a quorum for some 
upcoming petitions as he might have to recuse himself.
 
Lastly, MrHeniff mentioned that staff would be bringing forth for the Commissioners 
comments the possibility of consolidating the Plan Commission and Zoning Board of 
Appeals if they feel processes are being duplicated.
Unfinished Business
There was no unfinished business.
New Business
There was no new business.
Subdivision Reports
There were no subdivision reports.
Site Plan Approvals
030458
Chairperson Ryan stated that the petition was withdrawn by the petitioner.
It was moved by Commissioner Flint, seconded by Commissioner Burke, that this 
matter be withdrawn.  The motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Zorn and Burke
5 - 
Workshops
There were no workshops.
Adjournment
The meeting was adjourned at 10:40 p.m.