Transportation & Safety Committee
Meeting Minutes
April 12, 2004
1.0
Call to Order and Roll Call
The meeting was called to order by Chairperson Soderstrom at 7:30 p.m.
Chairperson Trustee Rick Soderstrom, Greg Gron, John Schwarz, Thomas 
Murphy, Arthur Kuehl and William Lepins
Present:
Vice Chairperson Trustee Steven D. Sebby and Thomas Gibbons
Absent:
Others Present:
David Dratnol, Village Engineer
2.0
Public Participation
MrJim Watson, 241 S Edson
MrWatson addressed the committee with a request for a stop sign on Edson between 
Maple and Madison.  MrWatson commented that Edson has become a raceway, 
especially in the early morning and dinner hour.  People use Edson as a cut-through 
because it is a straight shot.  There have been incidences of people being hit by cars.  
Nothing serious, but it's dangerous.  LtNuestadt suggested he come to a 
Transportation & Safety meeting.  This issue has come up before, the Police 
Department did have squad cars out there for a couple weeks and also set up the 
portable radar.  MrWatson stated that he's here to ask that the Village put up a stop 
sign wherever is deemed most appropriate.  He pointed out that there used to be a 
speed bump by the Prairie Path, but it was taken out so there's nothing to slow people 
down.  There are always close calls by the Prairie Path, however, the pedestrians have 
a stop sign.
 
Soderstrom replied that having served on this committee, one of the things he's come to 
find is that stop signs do not slow traffic down.  In some cases it has an adverse effect 
on speeding.  He told MrWatson the committee will entertain his request.  He also told 
MrWatson that some additional show of support from neighbors and any information 
about special circumstances, deaf children, etc., would be helpful.
 
Gembala explained warrants for stop control.  Stop controls are not used to control 
speeding.  Gembala offered that staff could see if it meets any of the warrants.  Dratnol 
also commented that  traffic calming is being looked into by Public Works Committee 
and Transportation & Safety.  That may be more appropriate.  Cuny commented that a 
speed study would be the next step.
 
The Police Department will do a speed study and bring it back to the committee.  A copy 
of the report will be sent to MrWatson.
3.0
Approval of Minutes
It was moved by  Lepins, seconded by  Kuehl, to approve the minutes of the 
March 12004, meeting.   The motion carried by a voice vote
4.0
Unfinished Business
030835
Residential Traffic Speed and Enforcement 
Cuny reviewed the February report.  The overall number of stops are decreasing, 
however, the number of tickets have not decreased.
 
Soderstrom asked the committee members to consider to what degree the information in 
this report is valuable.  Should Cuny continue providing it, has it served it's purpose, has 
it proven it's point?
030959
B.   Illinois Prairie Path Crossing Signage (Continued from May 6th
Recommendation from the Transportation & Safety Committee to install signage and 
pavement markings at the Illinois Prairie Path Crossings at Westmore-Meyers and Main 
Street (to include a raised median at Main Street).  (DISTRICTS #& #5
Gembala reviewed the handouts.
 
Westmore/Meyers Road
In this location the total roadway is 45', if we were to place an in-roadway sign there it 
would be an obstruction for vehicles.  Staff is recommending to install signs on the side 
of the roadway.  To enhance signs yield pavement markings could also be installed.  For 
north bound it was difficult to find a location.  The recommendation is to install the sign in 
the planter and cantilever it out a bit.  Gron asked how far the sign would be from the 
path.  Gembala responded that the required distance is 20'-50', this is at about 50'.  
Gron asked what the opinion is of installing washboard?  Dratnol responded that 
depending on usage, they can create a noise problem, so in a residential area it's not a 
good idea.  Kuehl asked if any striping would be put in at the Prairie Path.  Dratnol 
responded that Public Works would clean up the existing striping in the area.  Kuehl 
asked if infromation signs could be put in closer to the path that says Illinois Prairie Path.  
Gembala explained that if the signage is installed closer, motorists will not see the sign 
until they're at the crossing.  The committee briefly discussed the color of the signage.
 
Main Street
Gembala explained that with the 2-way left turn available at this location it would be 
acceptable to install an in-roadway sign.  There will be striping to the north and south of 
the signs.  The third sketch portrays if a median were installed on Main Street.  There 
was discussion regarding specifications of the proposed median.  Lepins asked if the 
median would impact snow removal.  Dratnol responded that snow removal would be 
handled the same as it has been.    
 
Lepins asked what the estimated costs for striping and the median are.  Dratnol 
estimated $2,000 for striping and $3,000-$4,000 for the median.
It was moved by  Murphy, seconded by  Kuehl, that this matter be recommend to 
the Board of Trustees for Approval.  The motion carried by the following vote:
Aye:
Gron, Schwarz, Murphy, Kuehl and Lepins
5 - 
Absent:
Gibbons
1 - 
040110
*F.   Transportation & Safety Committee Traffic Signals 
Recommendation from the Transportation & Safety Committee to install traffic signals at 
the intersection of Eastgate and Highland.  (DISTRICT #3
Soderstrom reviewed the previous direction taken by the committee.  Dratnol reviewed 
the information provided in his memo.  The intersection probably does meet the warrant 
for the two hours that it didn't previously.  At this particular intersection, one factor that is 
most concerning is the acutal use of the facility.  It's a medical facility and by nature of 
it's purpose, those conditions lead to distracted drivers.  He explained that he's not 
typically in favor of putting in signals without clear cut warrants being met, however, this 
is one instance where he is comfortable taking this step as a safety measure.  
Community Development has also received a petition from residents in the area.  Staff is 
recommending a traffic signal be installed at this location.
 
Murphy asked if the medical facility will still pay for the signal.  Dratnol answered that 
they would.  Murphy said that John Johnson was going to check to see if it would tie in.  
Dratnol explained that would be done as an interconnect project.  Kuehl asked if loop 
detectors would be installed.  Dratnol responded that it would be run by video detection.  
The cameras are more reliable than loops, loops fail.  Schwarz asked about the 
geometry of that intersection.  Dratnol responded that there's enough separation that we 
could have back to back left turn lanes.  The committee briefly discussed flaws in the 
original traffic study.
It was moved by  Kuehl, seconded by  Lepins, that this matter be recommend to 
the Board of Trustees for Approval to install a traffic signal to be paid for and 
maintained by DuPage Medical Group.   The motion carried by the following vote:
Aye:
Gron, Schwarz, Murphy, Kuehl and Lepins
5 - 
Absent:
Gibbons
1 - 
5.0
New Business
6.0
Other Business
Soderstrom announced to the committee that Justine Gembala has and will be 
assuming duties as staff liaison.
7.0
Information Only
040106
2002 Illinois Crash Facts & Statistics Booklet
8.0
Adjournment
It was moved by  Gron, seconded by  Kuehl, to adjourn the meeting at 8:20 p.m.   