Plan Commission
Village of Lombard
Village Hall
255 East Wilson Ave.
Lombard, IL  60148
villageoflombard.org
Meeting Minutes
Donald FRyan, Chairperson
Commissioners:  Martin Burke,
Stephen Flint, Ronald Olbrysh, 
Ruth Sweetser, Rocco Melarkey
and Sondra Zorn, Staff LiaisonWilliam Heniff
7:30 PM
Village Hall
Monday, February 18, 2002
Call to Order and Roll Call of Members
Commissioner Stephen Flint, Commissioner Ronald Olbrysh, Commissioner 
Ruth Sweetser, Commissioner Sondra Zorn and Commissioner Martin Burke
Present:
Chairperson Donald FRyan and Committee Member Commissioner Daniel 
Broderick
Absent:
Staff present included William Heniff, Senior Planner; Lisa Warren, Planner II; Margaret 
Gibbs, Planner I; Jennifer Backensto and Janet Petsche; legal counsel to the Plan 
Commission.
 
Read by laws
Vice Chairperson Flint called the order of the agenda.
Public Hearings
020060
Bill stated that the two petitions would be heard together.  the first was to create B5
and the second was the properties to be included.  Introducted JB to do pp presentation.  
Staff will go thru process.   JB gave a brief pp presentation.
on PC 02-06 and 02=07.  
 
Public participation
No one in favor of petition.
Against:
Owne Glennon, 14210 Woodward Dr., Orland Park, attorney for several buyers on 310
Main street who will be closing in the next week.  Few questions not objections.  
Concerns is realize CP goals.  in the CP it states the destruction of property and 
restructuring for different purpose.  He wanted t make sure that hisi property would be 
safeAlso, if there is destruction requiring reubilding will the cu be maintained.   The 
signatge of property two building with one of them over 30'feet back, can the sign be at 
front of property?  The CU if his client were to turn around and sell would the cu be 
grandfathered for the new buyer?
 
David Emerson passed.
 
Vince passed.
 
Mike Wisbatter, no comment.
 
Steve Hoffman, 63 205 sMain street, representing the Dairy Queen.  Been there 
almost 50 years.  Concerned about the 9' wide of parking spaces.  In checking the 
proeprties they run 7'to 9', is this a change or a continuination of existing width?
 
Harold Hoffman passed.
 
Al Cheeway, 25 EMaple.   created hybrid zone to presesnt for exisitng properties and 
for some new expansion.   Spoke against the possibility of story buildings.  brought up 
single family homes int he adjacent area and is worried about the setbacks which is 
building tall buildings right next to single family.   Referredto new or rehabbed buildings 
one block from the proposed area and feels they are taking away from the established 
residential areasDoesn't want to be overshadowed by tall buildings.  Wants the 
downtown to thrive but not stories.
 
Arlene Meek, 438 SThird, owners of 16 EAsh, directly east of Blake Lamb.  
approached last year by village fora story building next to their home.  spoke against 
stories not appropriate.  Wants to see redevelopment and growth but feels storeis are 
extreme.  Where will the parking be  with businessess on 1st floors.  Parking needs to 
be addressed for visitors of condos.and patrons of businessees.  
 
Flint introduced Joan DeStephano who was on telephone at 8:05.  She asked questions 
such as what is traffic impact on hgiher denisty.  
 
Kathy McCabe, 20 EAsh,  referred to workshop about the condosshe spoke about 
being overshadowed by the taller buildings.  concerned about traffic, children in 
neighborhood, type of people and how they vote.  don't want to see four stories.  
Jeoparideze neighborhoods.
 
Bil Heniff responded.  overall goasl of plan.  the intent was to cretea  match between the 
zo and the cp.   this serves as guiding force on how the village views .  
 
destruction of proeprty as cu.  cu require a public hearing before they are established.   
the auto services currently int he bare currently cu.  there will be no difference with this 
district.  if property destroyed while existing now, the rebuilding would require 
conformance.  this text amendemnts brings these properties into compliance and would 
allow for rebuildings these structures.
 
Signage if buildings set back more than 30' they can put a sign in front of property in 
close proximatitey to street.  pole sign up to 15' in hight.  if buildings put up toward the 
sidewalk or row line, the signage wouldl have to be reduced
 
CU if you have an established cu on a proeprty and you sold nad there was no break 
on the activity on site for 365 days, that cu would be valid.   the status of cu do not 
change
 
parking space width parking stalls that do not meet that 9' width that is the current 
code.  if there is something smaller it could be established as a legal nonconofrming, but 
if redone it would have to be to code.  
 
hiehgt of buildings stories staff went back to the cp which recommended stories.  
staff included stories thru a cu process.  shoudl someone want to construct something 
like stories they would have to have a public hearing.  would have to lookd at site 
design, impact on adjacent properties.  stories is permitted by right, same hight as 
now.  the only change is that stories would be a cu
 
planned development work with developers to miminze impact.
 
setbacks the main difference between the existing and proposed is by giving greater 
flexibility to the front yard it would push buildings further to street and farther away from 
resdiential properties.
 
taking away from established residential areas 
 
parking issues the proposed parking standards are the same throughout the village.  
petitioner is required to meet these on site.  otherwise public hearing for relief.  the 
physical limitations will be the force on how the site will be developed.  what is being 
proposed is no different.
 
traffic concers staff focused on is a design flexi9ability issues.  the intent is to devise 
more of a streetscape, peedestrian feel.  the intensity would not be any different than 
what it is now.  staff talked with village's traffic engineer about the concept.  their 
experience is that when businesses close to street, it has a calming effect and visual 
appearance of slowing down.  Traffic generation:  1.  staff feels taht the area be b5
greater site deisgn flixibility but no increase in traffic generation.  now if people find that 
the area is more desireable for shpping, restrurants, etcthen there might be an impact 
and this would promote the villageannd be good.  
 
types of residents that might want to reside staff realize condos atrtract more of an 
empty nester and if you had a m ultiple story a public hearing would kick in.
 
Commissioners:
RS the idea of a story cu that hiehgt was excessive.  during that process the 
community and the residents are partners with the understanding that the 
commisisoners wouldn't want them in their backyards.  Having the latitutde on each 
case to decide the story cu gives us the possible transition use.  Also, the streetscape, 
the buildings comin up to sidwalk, landscaping is a big questions.  what are villag's plans 
for street planters, etc.  Bill answered that if building close that doesn't mean no 
landscapingwill have interior landscaping.  the village has a 1st impression programs to 
supplemnent at various locations throught the village.  RS the bufffering of 10
landscaping would apply asked staff for numbers JB 25 do.  RS a couple where we 
could grant the cu.
 
RO agree with RS respect to building height issues.  staff expalined what the cp states 
is  stories and that a cu has to come before the commission.  however, stories is 
onerus in most conditions.  he referrenced the previous case they said nohe wouldn't 
want to live next door to a story.  the commisisoners workshopped this item and staff 
made approriate changes and what is presented is admirable and can work within.
 
RS to reiterate a point like offstreet parking and detention, these factors  limit the 
denisty of whaterver structure will go up.  underground parkign is an issue as well as 
street parking.  
BH we are not changing antying as to parking or detention.
 
PC 02-06
It was moved by Commissioner Olbrysh, seconded by Commissioner Sweetser, 
that this matter be recommended to the Corporate Authorities for approval.  The 
motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Zorn and Burke
5 - 
Absent:
Ryan
1 - 
Enactment NoOrdinance 5091 509
020061
It was moved by Commissioner Olbrysh, seconded by Commissioner Zorn, that 
this matter be recommended to the Corporate Authorities for approval.  The 
motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Zorn and Burke
5 - 
Absent:
Ryan
1 - 
Enactment NoOrdinances 5093-5095
8:30 a break for 5 minutes.
020055
Roll call taken again.  All present as before
Flint stated that thenext two petitions would run concurrently.
The petitioner Gary robhtbard, northbrook, contract purchaser on lot on proposed 
resub.  introduced the eingineer of subdivison and buidling and architect to address 
design of building of lot 1.  introducted Dave shindell, the engineer of project.
Dave shindill, mackie consultants, rosement.  land surveyors for subdivision.  19acre 
site north of North between Garfield on west and grace on east.  He referred to his 
diagram and showed the boundarieshe indicated progress dead ends where the 
project begins.  unique constraints to this project is wetland.  more than 1/of site 
currently is commprimised of easement of wetland and fllodplain.  also access, public 
unitility and topography constraints.  wan to develop usable area and rest is lot sub 
with maintainign the wetland floodplain (lot 2will be rezoned to CR and remaining 
parcels (lot and lot 3will be available to future development.  they are only looking at 
lot right now for rezoning to industrial which is compitable with uses to the west.  Next 
he showed a colored diagram showing the plateau.  working with fire deparatmaent , 
showed where water and santirary wil be, showed where detention would be.  another 
feature they are working with easements to lot 2he introduced nick batistich, architect.
 
NB, architect, 475 s frontage road, burr ridge.  Described the outside of building by 
showed the color elevations.  he descrtibed the building.  one story, south elevation 
facing north aveshowed the panel features to set off building and will have 
landscaping.  on the other side is the loading docks.  easta nd west side no doors.  
 
he then descirbed the floor plan and the different units for warehouse and office space.  
 
Gary in summary apparant thought thru projectuses consistent.  lot is compitable 
with the wetlands.  lot just rezoned with no development  at this time.  concept good 
usage for the proeprty.
 
Nick Samaraon no comment
Kathleen Dietz no comment
Louis Goebel no comment
Richard Stancoto no comment
Carl Jeske no comment
Sandra Jeske 2N139 Grace Lombard.  concerned about the traffic intersection at rush 
hour and concerned abou thtre extra congestion with the addition of this building with no 
other access point.  Asked abou tht kind of warehouse, is it a storage, or 
manufacturing?  Also, who are the owners of the proeprty?
 
Flint cautioned that should if you pass now you wont be able to speak later.
 
Daniel LHadle, 2N LaLonde, one of the elders of the neighborhood.  Seen alot of 
developement and this one bothers him.  He read into the record a letter regarding the 
request of Nicholas Batitisch for variations and approval of a development agreement.  
The land serves as an ecosystem and he stated what the US departament agency 
defines as an ecosystem.  the epa protects ecosystems to reduce polutants entering the 
environment.  he mentioned what could be at risk.  the residential area of different wells 
drilled at different depths could put them at risk.  they are asking an environemental 
study done to get an impact on the water table and the results made a matter of public 
record.  theis property alos servces as a detention for manor north subdivision.  concern 
is futher development will cause flooding.  request that the petitioner do a study on 
flooding and results made pbulic.  Also concerned over the impact on animals, Fish and 
Wildlife services to determine the impact of development in speciies and the results 
made public record and avilable to all lresidents.  Want prohibit any development from 
taking place until this is done.  Why was Addison Township not consulted in this matter.  
Somebody a few years back started a development then and want to know if an impact 
study was done.  since they started filling in back there I won't even drink my water.  He 
stated the flooding issues since they put the sewer line in.  Any plans for developer to 
put up bonds to give time for their devleopment to have an impact on the residents and 
environment.  Wants to know why the township wasn't notified.  Wants to know when 
the development schedule will begin.  Concerned with fill elevation and the contour of 
the land.  Feels both federal and state epa should be involved in this
 
Sandra Jeske again read the variation for lots to have access on street.  she watched 
the bot meeting where dah quoted one entrance.  here it shows individual driveways.  
alot of traffic.  can't even get the village to mow the easement.  She addressed the 
church petition and the drainage.  she ementioned how the drainage will go across north 
avenue and wants to know how much water one piece of property can hold
 
The petitioner Gary Rothbart rebutted
1.  he stated there are different lots and he named each and what they consist of.  Lot 
the type of users could be a manufacturer, office use, storage, allowable uses within 
the industrial .  Traffic north ave and main has fallen under 1st illinois program that 
intersection will be revamped.  was actrive in getting the light on lombard road.  aware of 
these matters as this would have a negative impact on their business.  Staking of 
property in order to the engineering they have done, to lay out site for thev arious gov
agencies for them to review thios is part of the process for gettiing the proerpty ready 
this is leg work  they are  not ready to start constrcution.  Lot is a lot where kids come 
on ride and feel their proposal is better, lit and better use than the way it is being used 
now.  
2.  Dave Shindell reubtted traffic issue the village has reqthe devefor a traffic 
study.  they did not want their opinion.  the village will have their tarffic consultant study 
done.  
stated it could be a number of uses in an I zoning.  
cul de sac vdriveways Grace street and Lot 3?  the proposal is not o rezone that lot.  
simply planning to subdivide.  hae a few concepts the owners are consdiering.  can't 
speak to that issue just yet.  There will be a single driveway access from Lot to 
Progress road and working with staff whether there will be a cul de sac.  
the project plans no fill  to the exisintg plateau.  in fact the stockpile on the plateau is 
planned to be taken off.  the intent of lot is that is intended to be zoned as CR and will 
be dedicated t the village for public use and maintenance to preserve as such.  
environmental impact done -- don't know and don't believe one has been done for water 
content or flow.  the water flow will be on lot 1.
stormsewer tiles we are staying away from and above and will be preserved.  on site 
the stormwater detention will be done.  will meet with kane dupage soil dsitrict as far as 
water quality run off thru on site detention ponds to improve the wwater quality before it 
runs off.  
Elevation of plateua its approx10 feet above garfield street to west.  can work with 
you and staff to give you those elevations.
He deferred to staff regarding bonds, LOC for those answers.  Deferred to NB as to 
owners.  its a land trust and NB is the beneficiary.
 
Staff report Heniff gave that.  gave a synopsis of petitions 04-05.  the fundamental 
issue is summarized by the  cp plan.  this mimics the cp approved in 1997.   He went 
thru issues with 04.  this creates a subdivison to establish lots of record and esatlish 
rframework for 05.  Planning property unique because of wetlands he described lot 1
lot is for a separte lot of record.  the intent is to divide proeprty according to cp.  Lot 
oriented to other industrial proeprties, lot consistent with wetlands and lot remainder 
parcel.  three variations associated with this petition.  lot will be greater than acre of 
size and full improvement will be required.  this was workshoped in november for 
appropriate land use for this site.  gave the conditionsto lot and access to lot 
easement.  staff recommends cross access across lot to lot 2.  With respec to intent of 
lot shoud this be developed as Buses or would the PC feel it should be residential.  
Right now the petiitoner is looking for direction, and did provide a packet for a single 
family concept but the PC thought the single family could exist if it included the 
annexation and incorpation of the storage yard to north.  Staff is supportive to 04 with 
two conditons.
 
05 can only be approved subject to approval of 04.  Lot map amendment to offer 
development .  LOt to rezoned to CR.  the map amendments for both lots mirror the 
cp.  comptiable with zo, staff only looked at relationship with lot 1.  two deviations 
included with pd.  staff is supprotive of the pd.   transtional yard variations to maximize 
the lot line of lot as it provides for a hgiher level of protection.   compitable with 
surrounding land uses.  the building orientated towards the way it is minimizes noise.  
traffic impact he reviewed trip generation for the site.  one concern was the access 
issue on Progress.  IDOT will be doing the full reconstruction of that intersection and will 
address alot of current existing problems.  this improvemnets will start later this year and 
will help improve.  staff is investigating the options avaiable as to vacation or culdesac 
bulbs and will be finalized with development agareement to site.  Noted peedestrian 
access and will be looked at at whole progress road extension imrpovements.  parking 
is adequately accommodated.  landscaping has been submitted and will meet code.  he 
described the outside building and t he materials and height.  the tenants and assignees 
are unknown at this time, tenant signage can be approved at a later datestaff 
recommends approval subject to conditions.  he read into the record, a concern with 
respect with the two conditions.  (I have no idea what you said!)staff is working with 
petitioner and staff addressed the concerns as he read.  
 
Wetlands and drainage small detention areas to ensure that the flow off lot is in a 
controlled manner.  the petand astaff worked closely with dupage county to make sure 
environemntal concerns adequately accressed.  tryhing to come up with a devleopment 
that is environmentally friendly.
 
notification and consulation followedd state statutes to notification.  impact with dupage 
county forest presere and asked if they were interested in acquiring that proeprty and 
they said no.  
 
bond issues will collect to make sure all done as proposed and will not have any 
negative impacts.
 
reitnerate no development on lotat this time.  should this change, the people that were 
notified would be notified of the development
Commissioenrs:
RS relative to truck dock is that at grade or below?  engineer they are planned to 
have two aspects.  the larger truck docks will just back up and some will have at grade 
doors and some slope up but not the depressed docks.  
Also, the parking spaces where is handicapped parking for? engineer the plan is to 
spread out along the southern access point where the offices are.  they are adjacent ot 
front of building.  
crpss access mentioned where would that be.  Bill stated that it needs to be addressed 
and that be provided and be recorded on plat.  because of environmental issues, want to 
look at least intrusive location to serve as landing point and then create a cross access 
to that property.  
page 7, easement be granted over the rea is that referring only to and 2?  Billyes.
the environmental piece the deptof envconcerns do they work with adjacent 
townshiips as there might be some impact and how that works.  Heniff.  the deptof eC 
looks at thewhole wetland area as far as impact.  if they determine there is an impact 
they would be responsible to notify the township.  the township has tuhority over the 
streets, drainage issues.  
water discharge into wetland area there is a mechanism where the run off would flow 
over a bed to catch setiment2.  the possiblity of water from thesouth side of north ave 
from redevelopment3.  the area marked c is that seeded adn will that be allowed to 
grow.  is there a way to prevent chemicals from entering wetland.
Engineer 1.  water quality features of strmwaterthe on site detention ponds have flat 
shallow bottoms and be vegatated so before it leaves the ponds silt and sediment could 
be removed.  another feature are theother measures to ensure errision measures such 
as seeding, silt fence during construciton, filter baskets to try to improve water run off 
quality.
3.  correct, the bottom will be allowed to grow the sides can be mowed and maintained.
BH regarding the run off from  the church RS concerned about flow and quality of 
water.  BH the water is looked at by dupage county.with additional plant materials will 
slow flow and is better for the quality.
RO environemtal issues there is a concern about the sensitie nature I would assume 
that thegroups that have looked at it, it will look at the quality of water and impact of 
wildlife.  will this be done before approval given ont he proeprtyBH staff will flollow up 
to make sure the well water is adequately addressed.  there is not a separate study to 
wildlife.  RO these are very important issues.  that will be standrd operating procedure 
before this matter will be approved.  BH will turn back to county health deparatment and 
have them amke statment to make sure not an impact.   
MB to  MrShindler.  are the improvemnts on lot impacting the floodplainengineer 
no but in regard to wetland buffer will be grading and plating to resesablish bufer 
otherwise no work propsoed in wetland area.  MB will a envstudy study be done to 
????  engineer are held to ??? he talked about their stormwater submittal which has 
been amde to the county and village.  talked about riparian.
RS elevations of building all precast concrtete?  NB yes all panels 12 width and 
24'high.  RS what about color is that pretty accurate.  NB yes beigem tauper with a 
darker band.
It was moved by Commissioner Sweetser, seconded by Commissioner Zorn, that 
this matter be recommended to the Corporate Authorities for approval  subject to 
conditions.  The motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Zorn and Burke
5 - 
Absent:
Ryan
1 - 
Enactment No240 East Progress Ro
020059
It was moved by Commissioner Sweetser, seconded by Commissioner Burke, that 
this matter be recommended to the Corporate Authorities for approval  subject to 
conditions.  The motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Zorn and Burke
5 - 
Absent:
Ryan
1 - 
Enactment No240 East Progress Ro
020053
Staff report:  JB gave request.  gave description of location and surrounding land uses.  
the fence is located around north ave and in front yard of outlot.  no fence ehight 
variation since it is 6' was ever given so they are requesting a variation.  gave theintra 
departmental comments.  
Planning since this is outlot no site issues with a 6'fence.  she mentioned north avenue 
elevations and its impact on a 4' fence which would be ineffective screening.  this 
screening is beenficial to have a barrier and staff believes this hiehgt will not have an 
impact on surrounding properties.
 
No one present ot speak for or against.
It was moved by Commissioner Sweetser, seconded by Commissioner Olbrysh, 
that this matter be recommended to the Corporate Authorities for approval with 
one condition.  The motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Zorn and Burke
5 - 
Absent:
Ryan
1 - 
Enactment NoOrdinance 5083 641-6
No comments from commissioners.
020054
Sandrq Sassano, Joliet Rd., Indian park, is petitioning additional signage.  their facility is 
a training facility and corporate training center.  there is another business with a similir 
name which gets mixed upwant greater visibility .
 
Greg Taski, works for enterprise,  stated no signage right now.  facility unique because 
main entrace is on north side of building which is not on street side of north avenue.  
found out that the current sign which is 4' high is not effective and therefore petitioning a 
wall sign on south wall for oncoming traffic and the signage on north side is more for 
recognition.  
 
No one present to speak for or against.
 
Gibbs presented staff report.  she gave request for wall signs for identification and 
direct vistors to facilities.  she gave description of the nature of the business of the 
facility and their need for the additional signage.  She gave where the propsoed signs 
would be placed and their intent.  She mentioned theother business and the similar 
name.   Gave intra deparemtntal comments.
 
gave history, and gave description of signs and they are illuminated.  She referred to the 
regulations in the industrial district and she gave the dimenstions of each and their 
location.  she mentioned the freestanding sign that mentions only the address.  petwill 
remove the sign and have therequested signs on the proeprty.  staff supports the 
petiition and she gave the reasons with one condition.
 
Commissioners:
RO petioner wants to illuminate the frestanding sign which contains only the business 
adress and asked if it would be on the building.  the petstated yes.
It was moved by Commissioner Olbrysh, seconded by Commissioner Burke, that 
this matter be recommended to the Corporate Authorities for approval with one 
condition.  The motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Zorn and Burke
5 - 
Absent:
Ryan
1 - 
Enactment NoOrdinance 5076 1050
020063
No one present to speak in favor or aginst.
 
Bill Heniff gave staff report.  he stated the request for a number of issues as  a clean up 
to make sure zo is consistent.  he mentioned the scriverners errors mentioned the miss 
in theBeven though if was taken out of Bbefore.  Also public utility and service uses 
should be included.
 
Redundancies repair service and rental it creates problems if you list in some places 
and dont in others.  the excpetion is auto repair.  mentioned what is being deleted.  staff 
feel to remove these redfuncices to make the zo clearer.
 
Antinuqated take out items no longer in existence.
 
Ambiguities computer sales and repairthis usenot carried thru oridnance
reclassification be used in the bdistrictstaff notes that electronic sales is listed in B
and this should be listed.
banquet hall parking since they function differently and should be added as a distinct 
category.  he gave the proposed standard and studies other communities how they do it.  
staff feels tying to functional aspect and use this as a proxy.
restaurant definitions ordinance does not differ between the fast food and sit down.  
uhe used pizza restaurant which could fall in either.  need to differentiate.  trying to 
quantify what is fast food vsit down.
He refered page 12 definitions concern is use of word preponderance.  if majority is 
more appropriate.  have characateristics for both.  by having a criteria for both can 
determine what they would be most like to give rationale.   stafaf recommends approval
 
Commisisoners:
RS page in order to make the ordinance more user firendly request preponderence 
become to majority.
It was moved by Commissioner Olbrysh, seconded by Commissioner Zorn, that 
this matter be recommended to the Corporate Authorities for approval.  The 
motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Zorn and Burke
5 - 
Absent:
Ryan
1 - 
Enactment NoOrdinance 5085  Amen
020062
No one present for or agsinst.
JB gave staff eport.  village has no ordinance for rooftop mechanicals.  this was 
worksho9pped to separate times by the pc.  the landguage staff proposed is idential to 
the january workshop except for section b.  1. "not be subject ot the maxbuilding height 
reqand 4.  painted so that it is the same color.  and 3.  materials used be compitable.
155.411 all mechanical   "established155.221 first sentence, shoudl be (can't hear you)
staff supportive.
MB B4confused why we added.  think its more important to match the facade.  JB the 
intention was that if you were looking at it fron the top it would match the roof.  To 
besure that the roof was consistent.  SF when you look from greound level would rather 
see.  MB was reading it wrong.  why would you want to make someone paint the 
equipment.  
RS agree with Commisisoner burke.  thought there were objections to screening about 
the top something about blocking ventilation.  Thnik this item shoul dbe revisisted.  why 
should you paint factory equipment another color would be asking for trouble.
BH should we strike #4.
Commisisoners voted to strike #4
It was moved by Commissioner Burke, seconded by Commissioner Sweetser, that 
this matter be recommended to the Corporate Authorities for approval.  The 
motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Zorn and Burke
5 - 
Absent:
Ryan
1 - 
Enactment NoOrdinance 5084  Amen
Business Meeting
Vice Chairperson Flint convened the business meeting at 10:35 p.mand requested a 
minute recess.
Approval of Minutes
The minutes of the January 142002 Plan Commission meeting were approved by 
unanimous consent of the Plan Commission.
Public Participation
Vice Chairperson Flint asked if there was anyone present who wished to address the 
Plan Commission regarding anything not on the agenda.  No one was present to speak.
DuPage County Hearings
There were no DuPage County hearings.
Chairperson's Report
The Vice Chairperson deferred to the Senior Planner.
Planner's Report
William Heniff referred to the updated development project list which was included in 
their packets.  He mentioned that staff was still researching possible concepts for a valet 
parking text amendment.   He reminded the Commissioners that at the last Plan 
Commission meeting, it was mentioned that the April meeting date would have to be 
rescheduled due to a conflict in the planners' schedules.  He referred to his 
memorandum which gave various alternative dates, stated that April 22 is staff's 
recommendation as the rescheduled date, and asked the Commissioners their 
preference.  The Commissioners concurred that the April Plan Commission meeting be 
rescheduled to April 22.
Unfinished Business
There was no unfinished business.
New Business
There was no new business.
Subdivision Reports
There were no subdivision reports.
Workshops
French Market 
Lisa Warren, Planner II, presented the workshop and mentioned that she had color 
reproductions she would like to circulate to the Commissioners which were furnished by 
Bensidoun Groupe.  MsWarren began by stating that the Village is looking into the 
concept of having a French Market in downtown Lombard in the parking lot at 105 WSt
Charles Road.  This parking lot is associated with the old Zitt property and the new 
Texan BBQ restaurant.  The market is slated to operate Saturday mornings from May to 
October and the hours of operation would be a.mto p.m.  The Farmers Market 
currently operating will be folded into the French Market.  She described what a French 
Market is and what is sold.  Groupe Bensidoun has been operating in and around Paris 
for over 40 years and now have decided to enter the American market.  
 
MsWarren indicated that there are two communities that currently have a French 
Market-the City of Wheaton and the Village of Villa Park.  The City of Wheaton has had 
a French Market since the spring of 1997.   Their market is located in a downtown 
parking lot which offers high visibiility and Lombard is desirous of doing the same.  The 
Village of Villa Park operates theirs on Sunday mornings from a.mto p.mfrom May 
to October in the downtown next to the Prairie Path.  
 
MsWarren explained the benefits of having such an event would included contributing 
to downtown revitalization, being a tourist attraction, adding a continential flair, fostering 
a sense of place, attracting a variety of  vendors, and generating traffic.  
 
The concept of having a French Market is easily adopted, continued MsWarren, as 
Groupe Bensidoun does most of the work associated with the market.  MsWarren 
contacted both the City of Wheaton and the Village of Villa Park requesting they share 
their experiences to date.   Their comments were as follows:
.   a favorable experience
.   City of Wheaton took a while to get established
.   the Bensidoun Groupe takes care of all the equipment, setup and marketing.
.   Village of Villa Park posted  two informational signs   
 
In conclusion, MsWarren requested that the Commissioners provide staff with 
additional input indicating if they would be in support of such a concept.  If so, a 
conditional use would be presented at the next Plan Commission meeting as there will 
be time constraints in order to start the Market in May of this year.
 
She showed a rough schematic of the parking lot property which would be used  for the 
market.  She indicated that the stalls would be set up on the outside with two rows in the 
center.  
 
Some of the comments/concerns from the Plan Commissioners were as follows:
 
.   Favored the concept but felt the area chosen to have the market would not be large 
enough.  Asked if there were other location options available.
 
.   If  the uses surrounding the market would be open when the market would be in 
operation causing a conflict with parking.  
 
.   That the current vendors in the Farmer's Market be asked to participate in the French 
Market.
 
.   Contract specifics (length of time the Village would be required to sign for and the 
amount.)
   
.   That the Lombard market will be competing with Wheaton as the days and hours of 
operation would be the same.
 
.   The underlying benefit to the Village.
 
It was the concensus of the Commissioners that they favored the French Market 
concept but requested additional information.
 
BP Amoco Roosevelt Road
William Heniff, Senior Planner, presented the workshop.  He indicated that BP Amoco is 
looking to redevelop several properties on the south side of Roosevelt Road and west of 
Highland Avenue as a new  BP Amoco gas station, car wash and cafe.  He referred to 
the color renderings showing their concept plan .  The existing properties consist of a 
gas station, beauty salon and Sharko's.  Required actions by the petitioner will include 
annexation of Sharko's site; approval of an annexation/development agreement; 
consolidation of all lots into one; rezoning of two properties into the B3; approval of a 
conditional use for a planned development, gasoline sales and automotive service, and 
two principal buildings on a lot; approval of an interior side yard setback and signage 
deviations.  
 
The benefits to this development would include redevelopment of the site with a modern 
facility; removal of an existing billboard; removal of existing non-conforming structures; 
and a reduction in the number of curb cuts.  MrHeniff indicated that there will be unique 
challenges the site will present due to the location of multi-family residences 
immediately south of the site.   These residences are located in the Bwhich are legal 
nonconforming.  
 
Staff is seeking input from the Plan Commission on this issue regarding a formal 
submittal specifically as to site layout and design, traffic flow, etc.  MrHeniff mentioned 
that to make the site work for traffic circulation purposes, the petitioner will need a 
variation for an interior side yard and will look at issues relative to utility easements.
 
Some of the concerns/comments by the Commissioners were as follows:
 
.   If that area is served well enough by cell towers to ensure wireless communications
(Bill not sure about this comment)
.   Was pleased with the placement of the curb cuts specifically their distance from the 
intersection.
.    Liked the concept as it would clean up the corner and modernize it.
.    The types of signage deviations which might be anticipated.
.    Potential for possible stacking to the ingress/egress Roosevelt Road
.    What type of car wash system would be used and the cycle time for each wash.
.    Like to see something in front of the store to caution pedestrians of the cut through 
traffic.
.   Have the traffic engineer look at the Highland entrance and determine if a right/in 
right/out is appropriate.
Adjournment
The meeting adjourned at 11:30 p.m. on February 18, 2002.