Vice-Chairperson Flint called the meeting of the Plan Commission to order at 7:30 p.m.
Roll Call of Members
Commissioner Stephen Flint, Commissioner Ronald Olbrysh, Commissioner 
Ruth Sweetser, Commissioner Martin Burke and Commissioner Rocco 
Melarkey
Present:
Chairperson Donald F. Ryan and Commissioner Sondra Zorn
Absent:
The following staff members were present:  William Heniff, AICP, Senior Planner; 
Jennifer Backensto, Planner I; and George Wagner, legal counsel to the Plan 
Commission.
Public Hearings
Vice-Chairperson Flint called the order of the agenda.  He stated that the petitioner associated 
with PC 04-25 is requesting a continuance of the petition to the August 16 Plan Commission 
meeting.
040308
A.   PC 04-25:  201205 and 211 ERoosevelt Road; 1200 SHighland Avenue; and 
112-116 120-124 E13th Street (Southwest Corner of Roosevelt & Highland
(Ordinance on Second Reading) (Item #Continued from September 2
2004/Waiver of First Requested)  
Requests that the Village take the following actions on the subject properties:
1.  Approve an amendment to an annexation agreement. (2/of Corporate Authorities 
Vote Required) (Waiver of First Requested)
2.  Approve a major plat of resubdivision.
3.  For the entire subject property, approve a conditional use for a planned development
4.  For Lot of the proposed subdivision, approve the following deviations:
     a.  A deviation from Section 155.706 (Cand 155.709 (Bof the Zoning Ordinance 
reducing the required perimeter parking lot landscaping from five feet (5'to zero feet 
(0'to provide for shared cross-access and parking.
     b.  A deviation from Section 153.505 (B)(17)(a)(2of the Sign Ordinance to allow for 
more than one wall sign on a street frontage.
5.  Pursuant to Section 155.414 (C)(7of the Zoning Ordinance, approve a conditional 
use for a drive-through facility on Lot of the proposed subdivision.
6.  For Lot of the proposed subdivision, approve the following deviations:
     a.  A deviation from Section 155.706 (Cand 155.709 (Bof the Zoning Ordinance 
reducing the required perimeter parking lot landscaping from five feet (5'to zero feet 
(0'to provide for shared cross-access and parking.
     b.  A deviation from Section 153.505 (B)(17)(b)(2of the Sign Ordinance to allow for 
more than one wall sign for interior tenants.
7.  Pursuant to Section 155.414 (C)(18of the Zoning Ordinance, approve a conditional 
use for an outdoor dining/service establishment on Lot of the proposed subdivision.
8.  For Lot of the proposed subdivision, approve a deviation from Section 155.706 (C
and 155.709 (Breducing the required perimeter parking lot landscaping from five feet 
(5'to zero feet (0'to provide for shared cross-access and parking; and
9.  For the entire development, grant site plan approval authority to the Lombard Plan 
Commission.  (DISTRICT #6)
Staff is requesting a waiver of first reading on the first amendment to the annexation 
agreement.
It was moved by Commissioner Sweetser, seconded by Commissioner Burke, to 
continue the petition to the August 162004 meetingThe motion carried by the 
following vote:
Aye:
Flint, Olbrysh, Sweetser, Burke and Melarkey
5 - 
Absent:
Ryan and Zorn
2 - 
Mr. Heniff read the Rules of Procedure as written in the Plan Commission By-Laws.
040311
G.   PC 04-22:  Text Amendments to the Lombard Zoning Ordinance (Waiver of 
First Requested)
The petitioner requests approval of a text amendment to Section 155.415 of the 
Lombard Zoning Ordinance, allowing religious institutions to be listed as a conditional 
use within the BCorridor Commercial District.
 
The Village also requests the approval of companion text amendments, as follows:
Section 155.412Adding "religious institutionsas a conditional use in the BLimited 
Neighborhood Shopping District;
Section 155.413Adding "religious institutionsas a conditional use in the BGeneral 
Neighborhood Shopping District;
Section 155.414Adding "religious institutionsas a conditional use in the B
Community Shopping District;
     Reclassifying "Clubs and lodges, nonprofit and fraternalfrom a permitted use to a 
conditional use in the B3 Community Shopping District;
Section 155.415Adding "religious institutionsas a conditional use in the BCorridor 
Commercial Shopping District (as also requested by the petitioner);
     Reclassifying "Clubs and lodges, nonprofit and fraternalfrom a permitted use to a 
conditional use in the B4 Corridor Commercial Shopping District;
Section 155.416Adding "religious institutionsas a conditional use in the BCentral 
Business District;
     Reclassifying "Clubs and lodges, nonprofit and fraternalfrom a permitted use to a 
conditional use in the B5 Central Business District;
Section 155.417Adding "religious institutionsas a conditional use in the B5
Downtown Perimeter District;
     Reclassifying "Clubs and lodges, nonprofit and fraternalfrom a permitted use to a 
conditional use in the B5A Downtown Perimeter District;
Section 155.418Adding "religious institutionsas a conditional use in the I Limited 
Industrial District;
     Adding "Clubs and lodges, nonprofit and fraternalto the list of conditional uses in 
the I Limited Industrial District;
Section 155.802Adding definition of "religious institution"
Sections 155.401 etseq.: Redirecting definitional references of "religious institutionsto 
Section 155.802.
The petitioner is requesting a waiver of first reading.  (DISTRICT #4
MrHeniff explained that the petitioner will present the petition for PC 04-22 and PC 
04-23 and staff will present the companion text amendments associated with the 
petition.  Vice-Chairperson Flint indicated that there will be a separate vote on each 
petition.  
 
John Pieper, attorney for the petitioner, the Maronite Catholic Bishop of the USA, 
presented the petitionThe subject property is Lot of the Terrace Lake Subdivison.  
Their petition is being brought forward to allow the for the church to establish a home in 
Lombard.  
 
He discussed the history of the church and mentioned their search for a new church 
site.  The  Zoning Ordinance needs to be modified to allow them to have a church in the 
Bas a conditional use.  They feel this site is suited to a church, and they are asking for 
the text amendment to move forward.  He mentioned the other types of assemblages, 
which are allowed in as conditional uses in business districts and stated that religious 
institutions should be considered in the same manner.
 
He then gave the specifics of the project.  He gave the location of the site, the acreage, 
and the surrounding land uses and mentioned the critical wetlands east of the site.  
They are seeking a conditional use to allow for a 19,000 square foot facility with seating 
for 300 persons.  He referred to the building plans and noted the second floor, which will 
have priest accommodations.  Parking lot lighting will be consistent with lighting 
standards.  Street lights will be installed as part of the public improvements.  He referred 
to the aerial photograph depicting the area north of North Avenue and west of Grace 
Street.  He noted the critical wetlands which impacts one of their variation requests.
 
He submitted color elevations of the church.  Referencing the site plan, the church is 
located on the southern boundary as it is the deepest portion of the lot.  The plan 
proposes two access points off of Grace and parking north of church that will include 
105 spaces.  To the west of the parking lot is a buffer zone that is required by DuPage 
County to be preserved for the critical wetlands.  Stormwater detention will be provided 
in the parking lot and the detention facility in the buffer zone area.  He referenced the 
landscape plan.  They have retained landscape consultants to provide an inventory of 
the types of trees and plantings that are consistent with the County Ordinance for the 
buffer zone.  
 
He then discussed the public watermain request.  Village code would require them to 
extend the watermain from its current terminus to the north property line.  This main 
would cause a problem for the Village and church.  For the Village, health concerns exist 
when you have a dead end main and the water will become that has to be purged 
consistently.  Fire hydrants will be installed east of the church.  They are asking that the 
watermain not be extended and will terminate at the service line to the church.  He 
mentioned the property to the north, which is currently unincorporated, and that they are 
hoping to acquire that parcel.  It is also the last parcel that would be annexed into the 
Village along Grace Street.  If it is necessary to extend the watermain, they will pay for 
the extension thru the companion development agreement.  This is a unique situation 
which will justify their request.
 
The transitional yard request addresses a unique situation.  The property to the west 
has critical wetlands and a 50-foot buffer is required.  The Zoning Ordinance requires a 
transitional yard of 30-feet and requires specific vegetation.  The required vegetation is 
inconsistent with the County's requirements.  He mentioned a management plan they 
must have with the County that requires the periodic controlled burning of the plantings.  
 
Regarding traffic generation, they will have two services on Sunday morning and 
religious training classes held between the two services.  That is their peak hour, which 
is the same time Grace Street will be at their lowest peak hours.  They feel they are 
consistent with the neighborhood.  He mentioned the bell tower and the bells are for 
aesthetics purposes and they are not audible from outside the church
 
Vice-Chairperson Flint then opened the meeting for public participation.  Edward Knight, 
265 Edgebrook Avenue, Wood Dale, stated that he is an alderman for the City of Wood 
Dale and Chairman of the Zoning Board.  He wanted to add support to the project.  It is 
a low impact use on residents of the area.  Traffic can be accommodated and it is a 
great location for the church.  He talked about the watermain if they made to bring it to 
north end of property, it would create a problem with their pressure.
 
Vice-Chairperson Flint then requested staff report.  William Heniff, presented the text 
amendments associated with PC 04-22 first and then discussed the major issues 
associated with 04-23.  
 
Regarding PC 04-22, staff reviewed existing uses in the various business zoning 
districts and compared to like uses such as meeting halls.  He referred to the staff report 
and the results are consistent with what the petitioner found.  Counsel reviewed the 
issue of religious institutional uses in business districts and felt the use is compatible 
with the B business districts.  Congregation and assembly hall uses should be 
considered in the same manner and function.  The text amendment makes all meeting 
halls in the B and I districts as conditional uses.  Case law finds that one district must 
allow religious institutions by right the O office districts meets that requirement.  He 
mentioned the standards for text amendments and lastly, he referred to the last page in 
appendix and mentioned the additional definition of a religious institution
 
Commissioner Olbrysh asked if the proposed the definition of religious institutions is 
broad enough to include convents.  MrHeniff said that it does.
  
Commissioner Sweetser asked about the term "religious institutions".  MrHeniff stated 
that the term is frequently used in zoning ordinances.  She also suggested an 
amendment to the definition for ease of understanding.
 
Vice-Chairperson Flint asked if there was any discussion.  There was none.
It was moved by Commissioner Olbrysh, seconded by Commissioner Sweetser, 
that this matter be Recommend for approval to the Corporate Authorities.  The 
motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Burke and Melarkey
5 - 
Absent:
Ryan and Zorn
2 - 
Enactment NoOrdinance 5523
040312
H.   PC 04-23:  950 NGrace Street (Waiver of First Requested/ResolutionMotion)
The petitioner requests use approval of the following actions for property located within 
the BCorridor Commercial District:
1.  A conditional use for a religious institution;
2.  A variation from Section 155.707 (B)(4to allow for alternate plant materials within a 
required transitional yard on the west side of the subject property;
3.  A variation from Section 154.404 (A)(3of the Subdivision and Development 
Ordinance modifying the public water distribution system requirements for adjacent 
properties; and
4.  Approval of a development agreement for the subject property. (Resolution)
5.  Petitioner is requesting a waiver of the Village's portion of the public hearing fees.  
(Motion)
The petitioner is requesting a waiver of first reading.  (DISTRICT #4)
Starting with the discussion of PC 04-23, MrHeniff summarized the petitioner's request.  
He noted the Comprehensive Plan depicts the site for commercial uses.  However, 
many religious institutions have similar characteristics as commercial uses
 
Regarding the surrounding land uses, this site is appropriate as residences exist to the 
east and  open space to the west.  This use is a less intense use than many other 
commercial uses and is compatible with the built environment.
 
Referencing the elevations submitted, they are not asking for any relief from bulk 
requirements.  Due to the critical wetland buffer, Lombard's planting requirements might 
not be appropriate for this location
 
He then mentioned the extension of the watermain to run it up to the church property.  
The petitioner wants special consideration not to go to the north end of the property.  
The property north of the subject property is zoned I-by DuPage County.  The land 
use for that property is not consistent with the Village's plan.  The adjacent property 
owner wants to keep with industrial use of the property and staff is not supportive of 
annexation of that property as an industrial parcel.  
 
The petitioner proposes to enter into a Development Agreement, stating that should the 
property be annexed into the Village, a reverse recapture obligation would be created
long dead end is not desirable and he mentioned that flushing the hydrant that would be 
needed and staff believes a variation could be supported
 
Vice-Chairperson Flint then opened the meeting for questions and comments by the 
Commissioners
 
Commissioner Olbrysh stated that the site is an excellent location for the church and a 
good use for the property.  This is really not a neighborhood type of church but a 
community church in a broader sense.
 
Responding to a question by Commissioner Olbrysh, Father Alfred, pastor of Our Lady 
of Lebanon described the differences and similarities between the Roman Catholic and 
the Maronite Catholic Church.
 
Commissioner Sweetser asked if the recommendation needs to include conditions 
pertaining to the public improvement requirements.  MrHeniff said that the petitioner is 
aware of the requirements and that the requirements are also listed within the 
Subdivision and Development Ordinance
 
Commissioner Burke stated that the watermain variation request is reasonable.  He 
asked about the Village collecting a bond rather than addressing the issue through the 
development agreement.  MrHeniff stated that a bond is a short-term obligation.  The 
agreement would be written to have the ability to state that if they acquire the I-
property, the watermain will not be needed.  The Village can also address the obligation 
through the agreement in the water billing processMrPeiper stated that water billings 
constitute a lien against real estate, so the security of the real estate provides the Village 
with protections
 
Commissioner Burke referenced the landscaping varianceWhat guarantee do we have 
that the County will make them put in the landscaping.  MrHeniff said that the County 
will push for the preservation of the wetland.  Commissioner Burke stated that the 
Director of Community Development has the final review of the landscape planting 
materials, which will tie into DuPage County's final approval
 
Commissioner Sweetser asked about the finance of recapture.  Recapture could talk a 
long time and an escrow bond is something typically required.  George Wagner stated 
that the development agreement will address the financing aspects.  Commissioner 
Sweetser stated that the agreement could ignore what the Commissioners have stated.  
MrHeniff stated that he would share the comments with Village Counsel.  Staff will note 
for the record that the Commissioners want to ensure that adequate protections are 
provided as part of this proposal
 
Commissioner Burke referred to condition #and mentioned the proposed educational 
rooms.  There should be language added to the conditions so the petitioner does not 
have to come back for an amended conditional use.  MrPeiper stated that the new 
definition of religious institution should allow for religious study activity.  MrHeniff stated 
that the condition was added to differentiate between religious study activity and general 
educational activities.  MrPeiper stated that his client knows that if their educational 
activities are more extensive, they would have to come back
 
Commissioner Burke referenced the southern elevation of the building, which lacks 
vegetationHe suggested that a condition be added to include plantings along the south 
property line.  
 
Commissioner Olbrysh asked about time limitations to the approval.  MrHeniff stated 
that code requires that the project be substantially underway within one year of approval 
of the Ordinance.  The petitioner has represented to staff that they want to break ground 
this fall and time is of the essence.
 
Vice-Chairperson Flint asked if there was any additional comments from the 
commissioners or the public.  There were none.
It was moved by Commissioner Sweetser, seconded by Commissioner Olbrysh, 
that this matter be Recommended for approval to the Corporate Authorities 
subject to the amended condition(s).  The motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Burke and Melarkey
5 - 
Absent:
Ryan and Zorn
2 - 
Enactment NoOrd5524, Res.32-05
1.   The petitioner shall develop the site essentially in accordance with site plan 
prepared by Nicholas Batistich Architects, hand-dated June 282004 and made a part of 
this request.
 
2.   That the conditional use shall be for the construction and operation of a religious 
institution on the subject property.  Should the petitioner or any subsequent property 
owners seek to operate uses such as, but not limited to, day care facility, pre-school 
activities, elementary school activities, a conditional use amendment will be required.
 
3.   That the petitioner shall apply for and receive a building permit for the proposed 
improvements.  Said plans associated with the permit application shall also address the 
comments noted in the Inter-departmental Group Report.
 
4.   That the site shall be constructed and operated in conformance with the Lombard 
Village Codes.
 
5.   That the relief granted as part of this petition shall be subject to the petitioner 
executing a development agreement with the Village.
 
6.   That the petitioner shall submit to the Village a final landscape plan for the 
transitional yard on the subject property.  The plan shall reflect any additional plant 
materials required as part of the DuPage County wetland approval process and shall 
include any additional transitional landscape plantings as required by the Director of 
Community Development.
 
7.   That the petitioner's final landscape plan shall also provide additional landscape 
plant materials along the south property line, with said planting subject to review and 
approval by the Director of Community Development.
040313
I.   PC 04-24:  1101 1105 EHighridge Road (Waiver of First Requested)
The petitioner requests that the following actions be taken on the subject property:
1.     Annexation to the Village of Lombard;
2.     Approval of a five-lot major plat of subdivision with the following variations:
     a.  For Lot 4 of the proposed subdivisionA variation from Title 15, Chapter 155
Section 405 (Eof the Village of Lombard Zoning Ordinance to reduce the minimum lot 
width from 75 feet to 35 feet in the R1 Single-Family Residence District;
     b.  For Lot 5 of the proposed subdivisionA variation from Title 15, Chapter 154
Section 506 (Dof the Village of Lombard Subdivision and Development Ordinance to 
allow for a lot without public street frontage.
The petitioner is requesting a waiver of first reading.  (UNINCORPORATED
Waheed Saeed, 221 Forest Trail, Oak Brook, stated that he wishes to annex 1101 and 
1105 EHigh Ridge Road into the Village.  His subdivision proposal is based upon the 
Village's recommendations, and he believes that it is appropriate.  The property will be 
divided into five lots.  Lots 12, and will exceed the zoning requirements at 75 feet 
wide and 300 feet deep.  They will each be greater than ½-acre.  Lot will require a 
variation for a 35-foot width and it will not be buildable.  Lot is mostly within a 
floodplain and it may be given to the County in the future.
 
Vice-Chairperson Flint then opened the meeting for public comment.  
 
Nancy Walker, 1108 EHigh Ridge Road, stated that she lives directly across the street 
from the property.  At the May 17 Plan Commission meeting, she and a group of other 
residents suggested that the lot be split into two 87-foot wide lots and one 86-foot lot.  
The proposed Lot will create a gap in the flow of homes and could become a prairie.  It 
will not be maintained and it could become an eyesore.  She does not believe that the 
property owner to the east would be willing to sell his lot to the petitioner.  She is 
concerned that Lot will be developed as an access road for Lot 5, which will destroy 
the block frontage and negatively impact traffic, creating a public safety hazard.
 
The petitioner stated that even if he is unable to purchase the property to the east, 
someone eventually will.  Builders want bigger lots, and in this high-demand area it is 
hard to find available land.  Lot won't remain undeveloped forever.
 
Commissioner Sweetser inquired as to the upkeep of Lot 4, stating that the neighbors 
would like to see something in excess of what is required by Code.  The petitioner 
responded that the Village's Code Enforcement staff makes sure that all land is 
maintained.  They do not allow tall grass, and the Village's ordinances will be enforced.  
He will be happy to maintain the lot as long as he owns it.
 
Bob Walker, 1108 EHigh Ridge Road, stated that the property has been a mess for 
some time.  He stated that the petitioner's proposal is fine, but he would like assurances 
that the 35-foot wide lot will be landscaped and will not be turned into a road.  He does 
not want kids back there.  He  is in favor of a proposal that would only create three 
residential lots because a homeowner caring for the land will keep it better maintained.
 
The petitioner stated that Lombard's regulations are stricter than DuPage County's and 
the lots will be maintained properly.  A developer will eventually purchase Lot and use 
it to the best of his ability.
 
Vice-Chairperson Flint then requested the staff report.  William Heniff, Senior Planner, 
stated that this petition has been modified from a previously denied petition.  Lots 12
and will meet the Rlot width requirement of 75 feet and they will be buildable.  Lot 
and require a public hearing to approve variations for width and street access.  
 
MrHeniff stated that if the subject property is not annexed into the Village, the proposed 
Lot could be built upon as a matter of right under DuPage County's regulations.  
However, the Village does not allow this type of lot, as it does not provide for continuity 
or emergency access to properties.  Staff would prefer to have Lot and Lot under the 
Village's jurisdiction to prevent the possibility of development on these lots.  Also, Code 
Enforcement would be better able to enforce property maintenance requirements.
 
MrHeniff stated that the 35-foot strip would be unbuildable, as would Lot 5.  This gives 
the assurance of no additional structures.  If the property at 1111 EHigh Ridge 
annexes into the Village, they could look at incorporating Lot into a different project.  
Lot is a floodplain area that may be dedicated to the forest preserve.  Staff believes 
that only three single-family residences should be built on this property, and 
recommends approval subject to the conditions noted in the staff report.  These 
conditions have been reviewed and approved by Village counsel
 
MsWalker asked if a road could be put on Lot or anything other than grass.  Mr
Heniff stated that if the forest preserve or park district wanted to locate a recreational 
facility or something of that nature, it would need to come back before the Plan 
Commission for approval because that is not part of this request.  Right now, Lot and 
Lot are not buildable, and the 35-foot lot width is not wide enough to accommodate the 
66 feet necessary for a public right of way.
 
Commissioner Olbrysh referred to a number of lots in the School/Ahrens area that are 
wider than 75 feet.  He asked why the 35-foot strip is not being incorporated into the 
other three lots, since larger lots would be more valuable and would not require a width 
variation.  MrHeniff stated that he believes the petitioner wanted to create three lots 
that meet Code.  The petitioner stated that Lot cannot be built upon because of the 
floodplain.  As far as the 35-foot lot is concerned, someone will buy it.  The neighboring 
property owner might purchase it to build two houses and make a lot of money.  If the 
neighbor does not buy the lot, some small local builder will and it will end up being 
beneficial to the community as a whole.
 
Commissioner Sweetser asked if Lot could be used as an access to a possible 
pedestrian path on Lot 5, should the forest preserve take over Lot 5.  MrHeniff stated 
that staff has not looked at any development on Lot and Lot 5, but the forest preserve 
has eminent domain powers to create an access road, if necessary.
 
Commissioner Burke asked if it would be appropriate to add a condition that Lot must 
be landscaped at the time Lot is landscaped, and it must be maintained consistently 
with Lot 3.
 
Commissioner Sweetser suggested that Lot be landscaped with Lot and kept in a 
manner that meets or exceeds Code.
 
Mohammed ASaleem, 230 NCardinal Avenue, Addison, stated that he purchased Lot 
and he does not want any development on Lot to invade his privacy.  He would like 
assurances that it will not be built upon.  MrHeniff stated that the Plat of Resubdivision 
will show the lots as non-buildable, and Lot will be landscaped when Lot develops.  
As they are not buildable, they will remain as open space.
 
The petitioner responded that staff has explained several times that Lot is not 
buildable.  It will be a separate lot on paper, but because it will be maintained the same 
as Lot 3, no one will notice that it is legally a separate lot.
 
There were no further questions from the Plan Commission.
It was moved by Commissioner Burke, seconded by Commissioner Sweetser, that 
this matter be Recommended for approval to the Corporate Authorities subject to 
the amended condition(s).  The motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Burke and Melarkey
5 - 
Absent:
Ryan and Zorn
2 - 
Enactment NoOrdinance 55255526
1.   The proposed Lot and Lot shall not be considered buildable lots of record; 
2.   The proposed Lot shall be relabeled as "Outlot A;
3.   The proposed Lot shall be relabeled as "Outlot B;
4.   The petitioner shall submit a complete and corrected Plat of Resubdivision prior to 
consideration by the Board of Trustees; and
5.   Lot shall be maintained in accordance with Village Code.  Additionally, when Lot 
is developed, Lot shall be landscaped with materials subject to the approval of the 
Director of Community Development.
Business Meeting
Vice-Chairperson Flint convened the business meeting at 9:22 p.m.
Approval of Minutes
The minutes of the June 212004 Plan Commission meeting were approved by 
unanimous consent of the Plan Commission.
Public Participation
Vice-Chairperson Flint asked if there was anyone present who wished to address the 
Plan Commission regarding anything not on the agenda.  No one was present to speak.
DuPage County Hearings
There were no DuPage County hearings.
Chairperson's Report
The Vice Chairperson deferred to the Senior Planner.
Planner's Report
William Heniff introduced and welcomed the new Associate Planner, Michelle 
Kulikowski.  He indicated her school and previous work backgrounds as well as some of 
the duties that she would be responsible for.
Unfinished Business
There was no unfinished business.
New Business
There was no new business.
Subdivision Reports
040314
J.   SUB 04-02:  300 Eisenhower Lane North
 Motion requesting approval of a one-lot plat of consolidation.  (DISTRICT #3)
William Heniff, Senior Planner, presented the staff report.  Associated with a building 
permit application, the petitioner is requesting approval of a one-lot plat of resubdivision 
for the subject property.  The plat proposes to make the tract of land a lot of record, as 
defined by the Zoning OrdinanceThis division is considered a major plat of subdivision 
as it is greater than one acre in size.  Therefore, it must be reviewed and approved by 
the Plan Commission and Board of Trustees.  The resubdivision meets all of the 
requirements of the Zoning Ordinance and Subdivision and Development Ordinance.  
 
Vice-Chairperson Flint opened the meeting for discussion and questions by the Plan 
Commission.  There were no comments by the members.
It was moved by Commissioner Sweetser, seconded by Commissioner Melarkey, 
that this matter be recommended to the Corporate Authorities for approval.  The 
motion carried by the following vote:
Aye:
Flint, Olbrysh, Sweetser, Burke and Melarkey
5 - 
Absent:
Ryan and Zorn
2 - 
Site Plan Approvals
There were no site plan approvals.
Workshops
There were no workshops.
Adjournment
The meeting was adjourned at 9:26 p.m. on July 19, 2004.
 
 
______________________________
Stephen Flint, Vice-Chairperson
Lombard Plan Commission
 
 
______________________________
William Heniff, AICP, Senior Planner
Lombard Plan Commission