1.0
Call To Order and Roll Call
The meeting was called to order by President Tross at 7:02 p.m.
President Richard J.  Tross, Vice President Rick Soderstrom and John O'Brien
Present:
James W. Hogan and Molly O'Toole
Absent:
Others Present:
 
Colin CampbellBurns McDonnell
Mike FoltaP.E.Burns McDonnell
2.0
Public Participation
3.0
Approval of Minutes
It was moved by Vice President Soderstromseconded by  O'Brienapproved the 
minutes of the March 92006 meeting.   The motion carried by a voice vote
4.0
BOLI Consent Agenda
060150
H.   Special Assessment 219 Resident Engineering (Resolution)
Resolution authorizing an Agreement with Burns McDonnell in the amount of 
$181,706.78 for resident engineering services associated with Special Assessment 219.  
(DISTRICT #6)
060172
A request to approve payout no14 to Civiltech EngineeringIncin the amount of 
$1,278.89 for design engineering services related to Special Assessment 219.  
(DISTRICT #6)
060174
A request to approve payout no19 to Engineering Resource AssociatesIncin the 
amount of $2,346.66 for design engineering services related to Special Assessment 
218.  (DISTRICT #6)
It was moved by  O'Brienseconded by President Trossapproved items 060150
060172and 060174.   The motion carried by the following vote:
Aye:
Tross, Soderstrom and O'Brien
3 - 
Absent:
Hogan and O'Toole
2 - 
5.0
Separate Action
060025
G.   Special Assessment 213B Resident Engineering Amendment #(Resolution
(Tabled March 162006)
Resolution approving Amendment Noto the contract with Burns McDonnell in the 
amount of $35,651.04 for resident engineering services related to Special Assessment 
213(West Road StCharles Road to Woodland Avenue).  (DISTRICT #1)
Mike Folta and Colin Campbell from Burns McDonnell were introduced.  They were in 
attendance to discuss Burns McDonnell's resident engineering amendment for Special 
Assessment 213B.  InitiallyWes Anderson outlined how Burns McDonnell will cover 
the remaining work to be done by R.WDunteman.  Mike Folta then reviewed the 
business history of Burns McDonnell and the Village of Lombard along with the scope 
and structure of the contract.  Mike Folta explained that with the time extension of the 
contractalong with the "hand-holdingof the residents of West Rdconcerning issues 
related to right-of-way improvements and on properties acquired by the Village,  Burns 
and McDonnell exceeded the original contract hours.  Trustee Soderstrom explained 
that BOLI is evaluating all contractsboth construction and professional services.  
Trustee Soderstrom continued to say that the 39.cost overrun is difficult to 
understand especially after the fact.  This should have been identified in a more timely 
manner.  Trustee Tross expressed that there was a communication failure of staff to 
inform BOLI of the issue.  There also was a communication failure between staff and 
Burns and McDonnell.  He also reiterated that he had concerns of how this issue was 
addressed and handled and that professional service contract issues like this not 
happen again.
It was moved by President Trossseconded by Vice President Soderstromthat 
this matter be approved.  The motion carried by the following vote:
Aye:
Tross, Soderstrom and O'Brien
3 - 
Absent:
Hogan and O'Toole
2 - 
6.0
Unfinished Business
7.0
New Business
8.0
Other Business
9.0
Information
10.0
Adjournment
It was moved by President Trossseconded by Vice President Soderstrom
adjourn the meeting at 7:33 p.m.   The motion carried by a voice vote