Meeting Minutes
Public Works Committee
Meeting Minutes
June 12, 2007
1.0
Call to Order and Roll Call
Meeting called to order by Chairperson Tross at 7:05 PM.
Richard J.  TrossDavid ArnoldKen BlakesleeDan MahalArthur Kuehl and 
Art Frerichs
Present:
John Kaforski
Absent:
2.0
Public Participation
Randy Patchett    Burns McDonnell Engineering
John Nachtrieb    FotelInc.  1125 EStCharles Rd.
3.0
Approval of Minutes
It was moved by  Mahalseconded by  Frerichs,  to approve.  The motion carried 
by a voice vote
4.0
Unfinished Business
070307
Proposed Policy for Street Side Mailbox Replacement Impacted by Snow Removal 
Operations
Anderson:  even if the mailbox does not meet the codewe will still install a temporary.  
We will not replace it if it does not meet code.  Arnold:  have been noticing a lot of these 
mailboxesand very few of them are just your average mailbox.  They are these very 
ornate structures and I am sure they will not fall within the $50.00 cost.  Some of them 
are brickand go all of the way to the curb.  Anderson:  we are really concerned with the 
mailboxes that are very close to or hang over the curb.  Tross:  we are going to 
inventory these.  We will be measuring grade to bottom of the boxand how far from the 
curb.  If it does not meet codethe home owner will be notified.  Anderson:  we give 
residents a copy of the USPS drawingnot our ordinance.  Mahal:  did we put a cap on 
this?  Anderson:  nowe did not.  Tross:  it is like to like.  Frerichs:  if you knock down 
my mailboxyou come back to fix it.  Anderson:  then it will include labor.  I will update 
policy to read this way.  The resident will hire someone to install the mailbox.  Mahal:   
can we get this info over the summer?  Anderson:  no problem.
It was moved by  Mahalseconded by  Blakesleethat this matter be recommend 
to the Board of Trustees for Approval.  The motion carried by a voice vote
5.0
New Business
070400
Backyard Drainage Grant Program Commercial.
Item taken out of order.
John Nachtrieb in attendance representing 1125 EStCharles Rd.  Voiced his opinions.  
Felt that the property did qualify since there are actually businesses at this location.  
Property takes up more than the average home lots.  Believes that if this  project does 
benefit both us and Lombardthis is the right way to go.  Tross:  this committee can only 
make a recommendation to the boardwill not set the policy.  Anderson:  provided 
committee with a history of the 1125 EStCharles Rdproperty.  Tross:  we have 
nothing before us to show what the proposal is.  Anderson:  right now they have no 
storm water system on the property.  They want to bore a line under the Prairie Path to 
Kenilworth Pond.  They experience flooding in their dock area.  Tross:  how far does TIF 
go?  Anderson:  from Grace to Westmore.  Reviewed the plan that had been 
submitted to private engineering.  Will need to obtain permits from the County to dig 
under the trail.  Arnold:  do we have concerns about oils in dock area getting into the 
pond?  Anderson:  IEPA standards will need to be met.  Frerichs:  vehicles today are 
different.  Tross:  have not finished reviewing the planshave not gotten permission from 
the County is there a dollar figure for this project?  Anderson:  he does not have a 
storm water system at all on his property.  Tross:  right now he has no drainage at all?  
Dratnol:  he pumps this water outbut needs to wait 72 hours.  Tross:  the rule that 
applies for or more contiguous properties might be applicable due to the square 
footage of the property.  Mahal:  where is the combined sewer?  Anderson:  it is on St
Charles Rd.  Mahal:  why was this not put in at the beginningwhen the property was 
first developed?  Not even addressing the codeI can't fathom why there was nothing 
put in at the beginning of the development of the property.  The original policy was 
developed to help residents with flooding issues that occur due to many different 
reasons (new constructionetc.)  Discussion ensued.  Arnold:  when Lombard Toyota 
was redonethey put in some new type of drain.  (French drain?)  Anderson:  they would 
have had to put in some type of underground storage.  Dratnol:  the ideal design is one 
large storage pond.  Tross:  would like to get a recommendation out of Community 
Development as to the what is the most efficient way to proceedand what the equity 
issues are residential versus commercial.  I personally do not want to see all of these 
businesses coming in and trying to obtain a $10,000.00 grant due to flooding issues.    
Committee instructed staff to get recommendation from Community Development and 
bring to the July 10th meeting.
It was moved by  Arnoldseconded by  Blakesleethat this matter be tabled.  The 
motion carried by a voice vote
070357
FY2007 Concrete Rehab And Utility Cuts PatchingFinal Balancing Change Order 
No
Authorizing a decrease to the contract with Triggi Construction in the amount of 
$32,589.00.
It was moved by  Kuehlseconded by  Frerichsthat this matter be recommended 
to the Board of Trustees for approval.  The motion carried by a voice vote
070364
FY2007 Driveway Apron and Sidewalk Restoration ProgramFinal Balancing 
Change Order No3
Authorizing a decrease of $19,847.00 to the contract with Kings Point General Cement.
It was moved by  Mahalseconded by  Kuehlthat this matter be recommended to 
the Board of Trustees for approval.  The motion carried by a voice vote
070365
FY2007 Dust Control ProgramChange Order No1
Reflecting an increase to the duration of the contract by one year (365 calendar days
with no increase in the previously authorized contract amount.
Dratnol:  we have $25K left in the budget from last yearjust want to extend the contract 
for another year.  Strictly for construction projects
It was moved by  Frerichsseconded by  Mahalthat this matter be recommended 
to the Board of Trustees for approval.  The motion carried by a voice vote
070391
FY2008 Asphalt Paving and Patching ProgramChange Order No1
Authorizing an increase to the contract with Brothers Asphalt in the amount of 
$185,316.85.
Revised memo passed out at the meeting regarding this item.  Dratnol reviewed with the 
committee members present.
It was moved by  Blakesleeseconded by  Mahalthat this matter be 
recommended to the Board of Trustees for approval.  The motion carried by the 
following vote:
Aye:
Arnold, Blakeslee, Mahal, Kuehl and Frerichs
5 - 
Absent:
Kaforski
1 - 
070398
South Broadway (East of Chase)Final Balancing Change Order No2
Authorizing a decrease to the contract with MQ Construction Company in the amount of 
$35,334.34.  (DISTRICT #5)
Dratnol reviewed the final balancing change order with the committee members.
It was moved by  Mahalseconded by  Blakesleethat this matter be 
recommended to the Board of Trustees for approval.  The motion carried by a 
voice vote
070399
Westmore-Meyers Road Underground Utility ProjectChange Order No4
Authorizing an increase to the contract with John Neri Construction Company in the 
amount of $83,432.45.  (DISTRICT #5)
Dratnol:  passed out a corrected copy of this change order at the meeting.  Amount was 
changed to $83,432.45 (increase).  Mahal:  questioned sidewalk amount.  Dratnol:  that 
was actually a decision made by staffis a safety issue.  (Tross:  sidewalks on St
Charles (brick paversare really getting bad out there.)  Tross:  this work was done by 
Neriand would have needed to be done anyway.  Kuehl:  Item#6?  Dratnol:  we did 
encounter contaminated soil in this area.  Kuehl:  could we go after the gas station 
owner?  Anderson:  would probably cost us more to go after them then what we would 
collect
Tross:  there still is a large change order amount out thereand staff is going to find out 
who was at faultand there may be litigation involved.  It is totally unacceptable that an 
Engineering Firm could come in with these types of errorsWhen will you have the 
analysis on this?  Dratnol:  we will have it for the July 10th meeting.   Arnold:  how far 
behind are we on this project?   Dratnol:  letting of the LAPP job is on schedule. (end of 
June award)  Depends on the timing we should be finishing up around the end of July 
with the underground work.  Arnold:  can we put up "detour signsfor the Taste of 
Lombard?  Dratnol:  traffic on Westmore will still be on half of the road.
Patchett:  there are some things that we could have done better.  We are trying to work 
along with the Village on these issues.  Tross:  hopefully they will all be resolved.
It was moved by  Kuehlseconded by  Mahalthat this matter be recommended to 
the Board of Trustees for approval.  The motion carried by the following vote:
Aye:
Arnold, Blakeslee, Mahal, Kuehl and Frerichs
5 - 
Absent:
Kaforski
1 - 
6.0
Other Business
Anderson:  Madison and Park flooding issues.  We have met with everyone and the ball 
is in their courts now to come back to us with applications.
Tross:  we will be meeting in July and we will not meet in August.
7.0
Information Only
970045
Project Status Report
980212
Change Order Report
980528
Overhead Sewer Grant Program-List of Applicants
010718
Backyard Drainage Grant Program
030008
Engineering Monthly Report
8.0
Adjournment
It was moved by  Frerichsseconded by  Kuehlto adjourn at 8:27 PMThe motion 
carried by a voice vote