Call to Order and Roll Call of Members
Chairperson Donald FRyan, Commissioner Ronald Olbrysh, Commissioner 
Ruth Sweetser and Commissioner Sondra Zorn
Present:
Commissioner Stephen Flint and Commissioner Martin Burke
Absent:
Chairperson Ryan called the order of the agenda.
 
MrHeniff read the Rules of Procedure as written in the Plan Commission by-Laws.
Public Hearings
030373
James Plodzien, representative for Samvest, presented the petition.  MrPlodzien stated 
that the hotel applied and had been accepted as a Marriott franchisee.  A swimming pool 
and spa was a requirement for all Marriott franchises, therefore Samvest requests 
approval.     
 
Chairperson Ryan then opened the meeting for public comment.  
 
          No one spoke for or against the petition.
 
Chairperson Ryan then requested the staff report.  
 
Angela Clark, Planner I, stated that the petitioner intends to re-brand the existing Quality 
Inn located on the subject property to become a new franchisee of Marriott International, 
Inc.  A corporate requirement of their franchising approval requires 
a pool and spa to be located at the facility.  Since the pool and spa were not included 
with the original site plan and constitutes an expansion to an existing conditional use, 
the petitioner requests amendments to Ordinances 4535 and 4732 which annexed the 
site into the Village as well as an amendment to Ordinance 4538 which granted 
conditional use approval for the planned development and hotel.  MsClark then noted 
the IDRC commentsThe Fire Department/Bureau of Inspectional Services requested 
approval from the Illinois Department of Public Health and submittals of complete 
drawings showing electrical, plumbing, mechanical, fire alarm, and sprinkler diagrams 
prior to permit issuance.  MsClark also noted an amendment to the staff report.  The 
Private Engineering Services stated that the proposed addition would require an 
additional 730.15 cubic feet of detention.   Private Engineering also noted that the 
proposed floor plans indicated an existing fire hydrant on the East Side of the addition.  
This hydrant is shown to be less than five feet from the proposed foundation.  The 
Village of Lombard requires that hydrants be located at least feet away from building 
foundations.  The pool addition shall not encroach into an existing watermain easement.  
Either relocate the hydrant or adjust the location of the addition to provide the necessary 
separationPlanning noted that in review of the standards for conditional uses presented 
to justify the initial hotel petition in 1998 are still warranted and applicable to the 
proposed hotel addition as well.  Staff found that the addition of the pool and spa are 
compatible with the general overall use of the site as a hotel.  Staff noted that although 
this is a minor addition, its proximity to North Avenue would make it a visible element of 
the hotel building.  The addition will be a one-story addition of about 760 square feet in 
size.  The exterior of the building will be a split faced block consistent with the cream 
color of the existing hotel.  The seamless metal roof will also be consistent with the 
existing roof on the hotel.  Staff finds that the proposed use would be compatible with 
the comprehensive plan and surrounding land uses.
 
Chairperson Ryan then opened the meeting for discussion among the Commissioners.
 
Commissioner Sweetser asked if it was feasible to move the fire hydrant.
 
MsClark stated that the she had provided the petitioner with those comments prior to 
the meeting and that they would have to revisit their site plan.
 
Commissioner Sweetser asked if the petition could be approved in light of this comment.
 
William Heniff, Senior Planner, stated that the moving of the fire hydrant could be a 
condition of approval.
 
Commissioner Sweetser noted that the address on the staff report stated 645 WNorth 
Aveand the petitioner's address was listed as 665 WNorth Ave.
 
MrPlodzien stated that the address of the petitioner's office address was 665 WNorth 
Ave., but the property in question was located at 645 WNorth Ave.
 
Commissioner Sweetser noted a discrepancy between the staff report and the Private 
Engineering Services' comments.  The staff report indicated that the addition would be 
760 square feet and the PES comments noted the addition as 1,327.30 additional 
square feet of impervious surface.  
 
MrPlodzien stated that the proposed plans identify the addition as 760 square feet.
 
MrHeniff stated that the calculations would be verified with PES.
It was moved by Commissioner Sweetser, seconded by Commissioner Olbrysh, 
that this matter be recommended to the Corporate Authorities for approval  
subject to conditions.  The motion carried by the following vote:
Aye:
Ryan, Olbrysh, Sweetser and Zorn
4 - 
Absent:
Flint and Burke
2 - 
Enactment NoOrdinances 5325 53
The conditions this petition were subject to are:
 
1That the petitioner shall develop the site consistent with the site plan submitted as 
part of this petition prepared by W-T Civil Engineering, LLC and made a part of this 
request.
 
2That the petitioner shall satisfactorily address the comments noted within the IDRC 
report.
 
3That the site shall be developed and operated consistent with Village Code.
 
4The proposed pool addition shall not encroach into an existing watermain easement 
and all hydrants shall be located at least five feet away from the building foundation.
Business Meeting
Chairperson Ryan convened the business meeting at 7:40 p.m.
Approval of Minutes
The minutes of the May 192003 Plan Commission meeting were approved by 
unanimous consent of the Plan Commission.
Public Participation
There was no public participation.
DuPage County Hearings
There were no DuPage County Hearings.
Chairperson's Report
Chairperson Ryan deferred to the Senior Planner.
Planner's Report
William Heniff stated that as there are a number of submittals for July, a second Plan 
Commission meeting would be needed.  Through this discussion, it was determined that 
a second meeting of the Plan Commission will be held at 7:p.mon July 282003 at 
the Village Hall.
Unfinished Business
There was no unfinished business.
New Business
There was no new business.
Subdivision Reports
There were no subdivision reports.
Site Plan Approvals
030374
William Heniff, Senior Planner, presented the petition.  He opened by noting that there 
were representatives in the audience for the petitioners Starbucks and Baja Fresh.  He 
opened the discussion by referencing past actions by the Plan Commission that 
approved a two phase, 10,680 square foot retail building on the subject property as part 
of SPA 00-05 in November, 2000.  The first phase consisted of a 5,780 square foot 
Jared jewelry store, which opened in 2001.  Phase II, consisting of 4,900 square feet of 
additional space to include another retail commercial tenant and/or a small restaurant 
use is now under construction.  The new property owner has entered into lease 
agreements with Baja Fresh and Starbucks Coffee to locate within the Phase II area.
 
A condition of SPA 00-05 stated that "the petitioner shall apply for site plan approval 
prior to construction or installation of any awnings or signage proposed as part of the 
Phase II development."  As the tenants are now proceeding with their construction 
plans, they are now requesting site plan approval for their respective sign packages.
 
He noted that unlike the previous Site Plan Approval, the petitioner's request consists 
exclusively of wall and window signage elements.  No awning signage is proposed.  He 
then described each of the signage elements for the proposed elevations.  He noted that 
the signage is consistent with the initial plans presented in 2000.
 
A sample forest green with black weaving awning fabric has been submitted for the 
Commissioner's review and approval.  In review of the color relative to the overall color 
palate approved by the Plan Commission in 2000 for Phase II, staff finds that the awning 
color is compatible with the proposed signage for the development.
As depicted on the elevational drawings, Starbucks requested the Commissions 
thoughts regarding the appropriateness of a surface film that would be applied to the 
selected windows.  This request is made as the windows will look into work areas and 
secure areas of the restaurant.  The proposed film is applied to the inside of the window.  
While they could install a clear color which would provide a black or mirrored 
appearance, they are proposing to utilize a film which a mural design to provide greater 
visual interest to the west elevation.  Staff felt that the mural film would be acceptable.
 
He also noted an elevational change for the Baja Fresh store layout.  As shown on the 
exhibits, three changes are proposed to the north elevation in order to accommodate the 
interior build-out of the restaurant.  The petitioner proposes to modify the type of door 
from a solid to a framed glass doorTo the right, they also propose two new glass 
windows that are intended to provide additional light into the dining area.  Lastly, they 
propose to remove the glass around the arch on the north elevation and replace it with 
EIFS matching the exterior of the building.  This change is proposed, as the previously 
located glass windows would be looking directly into the kitchen area and the restrooms.
 
Chairperson Ryan then opened the meeting for comments from the Commissioners.
 
Commissioner Sweetser asked for clarification of the proposed building materials on the 
north elevation where the windows were originally proposed.  MrHeniff stated that it 
would consist of a Chocolate Mil colored EIFS.
 
Commissioner Sweetser asked about the desirability of a Starbuck's sign on the north 
elevation.  MrHeniff stated that they are not requesting a sign on the north elevation at 
this time as the sign would be situated immediately above the proposed dumpster 
location.
It was moved by Commissioner Olbrysh, seconded by Commissioner Sweetser, 
that this matter be approved with conditions.  The motion carried by the following 
vote:
Aye:
Ryan, Olbrysh, Sweetser and Zorn
4 - 
Absent:
Flint and Burke
2 - 
1That the site be developed in conformance with the signage plans prepared by Visible 
Graphics, dated April 42003 and Starbucks submitted June 42003 and made a part of 
the request.
2That the awning material shall be consistent with the sample submitted by the 
petitioner as part of this request.  Furthermore, shall the Director of Community 
Development determine that the awning materials has become deteriorated, the 
petitioner shall be required to replace the fabric with a new fabric consistent with the site 
plan approval submittal.
Workshops
Adjournment